Laserfiche WebLink
Master Bedroom f#2001 <br /> 1. Frame the waits, tray ceilings, and balcony. <br /> 2. Heating, Venting, &Air Conditioning <br /> a. Install supplies and retums as necessary per renovations and provide new register <br /> covers as necessary. <br /> 3. Electrical <br /> a. Install (3) owner-supplied�xtures on single pole switching <br /> b. Install (2) owner-supplied exterior�xtures on single pole switching <br /> c. Install (1) GFCI duplex outlet in a waterproof box at the balcony <br /> d. Install (9)AFCI duplex outlets per code <br /> e. Install (2) phone jacks <br /> f. Install (1) CAN jacks <br /> g. Install (1) data jacks <br /> h. Wall switches shall be located at 42"to top of box from subfloor, unless noted otherwise. <br /> 4. Insulation <br /> a. Install insulation as specified. <br /> 5. Drywall <br /> a. Install and finish the drywall at new walls and ceilings. <br /> 6. Flooring carpet by owner <br /> 7. Cabinetry (see alternates) <br /> 8. Provide and install the Millwork <br /> a. Install 2668 pocket door at the closet with passage hardware. <br /> b. Install baseboards <br /> c. Install window and door casings <br /> 9. Painting and Finishing by owner <br /> Walk In Closet f#2011 <br /> 1. Frame the walls and ceilings <br /> 2. Heating, Venting, 8�Air Conditioning <br /> a. Install supplies and retum locations as necessary per renovations and provide new <br /> register covers as necessary. <br /> 3. Electrical <br /> a. Install (2) fluorescent lights with single pole switching <br /> b. Install (3) standard duplex outlets per code <br /> c. Wall switches shall be located at 42°to top of box from subfloor, unless noted otherwise. <br /> 4. Insulation <br /> a. Install insulation as specified <br /> 5. Drywall <br /> a. Install and finish the drywall at new walls and ceilings. <br /> 6. Flooring, carpet by owner <br /> 7. Cabinetry (see alternates) <br /> 8. Provide and install the Millwork <br /> a. Install 2468 interior door at the bathroom with privacy hardware <br /> b. Install baseboards <br /> c. Install window and door casings <br /> 9. Painting and Finishing by owner <br />