My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P10851 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
P
>
Pheasant Road
>
2680 Pheasant Road - 21-117-23-23-0020
>
Permits/Inspections
>
2007-P10851 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:03:28 PM
Creation date
6/27/2018 12:32:56 PM
Metadata
Fields
Template:
x Address Old
House Number
2680
Street Name
Pheasant
Street Type
Road
Address
2680 Pheasant Road
Document Type
Permits/Inspections
PIN
2111723230020
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Master Bath [#20?] <br /> 1. Frame the walls and ceilings. <br /> 2. Plumbing <br /> a. Supply and install the following fixtures (with allowances noted below) at locations per <br /> plan <br /> i. Shower Faucet &Valve $400 <br /> ii. (2) Lavatory Faucets $200 each <br /> iii. Toilet & Seat $500 <br /> 3. Heating, Venting, 8�Air Conditioning <br /> a. Install supply and return locations as necessary per renovations and Provide new <br /> register covers as necessary. <br /> b. Provide and install bath exhaust fan [max 110 CFM] and insulated ductwork with exterior <br /> roof jack or wall vent as necessary. <br /> 4. Electrical <br /> a. Install (2) recessed lights with standard trim on single pole switching <br /> b. Install (1) recessed lights with shower trim on single pole switching <br /> c. Install (2) owner-supplied fixtures on single pole switching <br /> d. Install (2) GFCI duplex outlets at vanity <br /> e. Wire the bath fan <br /> f. Wall switches shall be located at 42�to top of box from subfloor, unless noted otherwise. <br /> 5. Insulation <br /> a. Install insulation as specified. <br /> 6. Drywall <br /> a. Install and finish the drywall at new walls and ceilings. <br /> 7. Cabinetry <br /> a. Supply and install clear maple finished vanity, per plans, with flat panel, full overlay doors <br /> &drawer fronts. <br /> 8. Counter Tops <br /> a. Provide and install standard cultured marble top with integral backsplash and set on side <br /> splashes with 2 standard integral sinks <br /> 9. Tile <br /> a. Floor: Provide and install mudset base and ceramic tile floor with $8 PSF (per square <br /> foot) allowance for tile materials, including Corian/stone thresholds at floor finish <br /> changes. <br /> b. Shower: Provide and install sloped mudset pan and curb with EPDM rubber membrane, <br /> second mudset pan and Denshield (or equal)wallboard to 8 feet above floor, with liquid- <br /> applied elastomeric waterproofing membrane. Provide materials allowances of$8 PSF <br /> floor tile and $10 PSF wall tile, in areas as noted on plans(floor, walls, and ceiling). <br /> 10. Provide and install the Millwork <br /> a. Install baseboards <br /> b. Install window and door casings <br /> 11. Painting and Finishing by owner <br /> 12.Accessories and Hardware <br /> a. Provide and install up to 4 items provided within an allowance of$200.00 for <br /> accessories such as towel bars, toilet paper holders, robe hooks, etc. <br /> 13. Mirrors and Shower Glass <br /> a. Provide and install 2 clear mirrors 36°x42" at the master bath as noted on the plans. <br /> b. Furnish and install frameless heavy glass shower door and panel with clear glass and <br /> brushed nickel metal handle and hinges. <br />
The URL can be used to link to this page
Your browser does not support the video tag.