Laserfiche WebLink
6. Flooring at stairs and landing: Carpet by owner. <br /> 7. Provide and install the Millwork <br /> a. Install baseboards <br /> b. Install window casings in the stairwell <br /> c. Install stair railings including: <br /> d. Install (1) maple C4091 newel posts <br /> e. Install maple C6210W plowed and C6210W handrail <br /> f. Install maple C5060 balusters spaced per code requirements <br /> i. Including [rosettes, brackets] as necessary. <br /> 8. Painting and Finishing by owner . <br /> Mud Room f#101] <br /> 1. Demolish the existing room completely down to bare studs as necessary. Salvage the existing fire <br /> door for re-install. <br /> 2. Frame the new walls per plans <br /> 3. Heating, Venting, &Air Conditioning <br /> a. Modify supply and return locations as necessary per renovations and Provide new <br /> register covers as necessary. <br /> 4. Electrical <br /> a. Install (2)fluorescent lights with on 3 way switching <br /> b. Install (2) standard duplex outlets <br /> 5. Insulation <br /> a. Install insulation as specified at renovated locations: mudroom/garage walls <br /> 6. Drywall <br /> a. Install and finish the drywall at walls and ceilings. <br /> 7. Cabinetry <br /> a. Supply and install clear finished maple lockers similar to the existing ones, per plans, <br /> with flat panel, std overlay doors. <br /> b. Re-install existing lockers <br /> 8. Tile <br /> a. Floor: Provide and install mudset base and ceramic tile floor with $8 PSF allowance for <br /> tile materials, including Corian/stone thresholds at floor finish change at the kitchen. <br /> b. In all the above tile applications, install standard type and color grout. <br /> 9. Provide and install the Millwork <br /> a. Re-Install the fire rated exterior door at garage with existing hardware <br /> b. Install baseboards <br /> c. Install door casings <br /> 10. Painting and Finishing by owner <br />