Laserfiche WebLink
7. Device color shall be [white] unless noted otherwise. <br /> 8. PerForm the following Code Required improvements: <br /> a. Install smoke detectors in bedrooms and hallways <br /> Plumbina <br /> 1. Include all plumbing waterlines, waste, vent, demolition and installation for remodeling per print to <br /> include the work in the master bathroom. <br /> 2. Provide and install a new 52-gallon electric water heater for the new bathroom (located in the existing <br /> mechanical room). <br /> 3. Refer to Interior Room Schedule of Work for plumbing fixture allowances and finish work <br /> HVAC <br /> 1. Run new ductwork zoned as necessary per plans through the comer of the mudroom from the <br /> existing forced air system. <br /> 2. Vent the master bath fan. <br /> 3. Install a new thermostat for the master suite. <br /> Interior Room Schedule of Work <br /> Garage f#98 & 991 <br /> 1. Demolish the existing garage south and west walls, floor and ceiling <br /> 2. Frame the new walls and ceiling <br /> 3. Electrical <br /> a. Install (6) keyless fixtures on 3 way switching <br /> b. Install (3) owner supplied exterior fixtures on single pole switching <br /> c. Install (1) GFCI duplex outlet <br /> d. Install (2) standard duplex outlets garage door openers <br /> 4. Drywall <br /> a. Install and fire tape the drywall at the common walls to the house and ceilings only per <br /> code with type x fire rated sheetrock. <br /> 5. Flooring <br /> a. Install a six inch thick concrete slab tied into existing. <br /> 6. Provide and install the Millwork <br /> a. Install door casing at the entry door. <br /> 7. Provide and install a 10'x7' raised panel garage door with a 1/3 horsepower opener, re-install the <br /> existing garage door and opener. <br /> 8. Painting and Finishing <br /> a. Primed only <br /> LivinQ Room f#100 & Stairsl <br /> 1. Demolish the closet at the foyer, the ceiling over the dining area for the barrel vault <br /> 2. Frame the new stairs and barrel vault. <br /> 3. Heating, Venting, 8�Air Conditioning <br /> a. Modify supply and return locations as necessary per renovations and provide new <br /> register covers as necessary. <br /> 4. Electrical <br /> a. Install (3) recessed lights with trim on 3 way switching <br /> b. Install (1) duplex outlets at stair wall <br /> c. Wall switches and wall outlets shall be located at 42"to top of box from subfloor, unless <br /> noted otherwise. <br /> 5. Drywall <br /> a. Install and finish the drywall at new walls and ceilings. <br />