My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southways Project # 18-3998
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Rd
>
1400 Bracketts Point Rd - PID: 11-117-23-32-0025
>
Land Use
>
Southways Project # 18-3998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:30:23 PM
Creation date
6/12/2018 4:35:06 PM
Metadata
Fields
Template:
Address
House Number
1400
Street Name
Bracketts Point
Street Type
Road
Address
1400 Bracketts Point Road
Document Type
Land Use
PIN
1111723320025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Hennepin County for County Road Access and Wark in County Rights-of- <br /> Way <br /> • DNR for Dewatering <br /> • City of Orono for Building Permits <br /> • Minnehaha Creek Watershed District for erosion control permit and storm <br /> water management permit <br /> • NPDES Permits (National Pollutant Discharge Elimination Systems) issued <br /> by MPCA <br /> 11. DEWATERING. Due to the variable nature of groundwater levels and <br /> stormwater flows, it will be the Developer's and the Developer's contractors' and <br /> subcontractors' responsibility to satisfy themselves with regard to the elevation of groundwater <br /> in the area a.nd the level of effort needed to perform dewatering and storm flow routing <br /> operations. All dewatering shall be in accordance with all applicable county, state, and federal <br /> rules and regulations. DNR regulations regarding appropriations permits shall also be strictly <br /> followed. <br /> 12. TIME OF PERFORMANCE. The Developer shall install all Improvements as <br /> contemplated by Section 8 and the approved Plans by December 31, 2019, with the exception of <br /> the final wear course of asphalt on streets. The fmal wear course on streets shall be installed <br /> between August 15th and September 15th the first summer after the base layer of asphalt has been <br /> in place one freeze thaw cycle. The Developer may, however, request an extension of time from <br /> the City. If an extension is granted, it shall be condirioned upon updating the"security"to reflect <br /> cost increases and the extended completion date. Final wear course placement must have the <br /> written approval of the City Engineer, and may be delayed or scheduled at any time of the year <br /> based upon existing site conditions at the discretion of the City Engineer. <br /> 13. LICENSE. The Developer hereby grants the City, its agents, employees, officers <br /> and contractors a license to enter the Land to perform all work and inspections deemed <br /> appropriate by the City in conjunction with development of the Land. <br /> 5 <br /> Southways V3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.