My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southways Project # 18-3998
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Rd
>
1400 Bracketts Point Rd - PID: 11-117-23-32-0025
>
Land Use
>
Southways Project # 18-3998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:30:23 PM
Creation date
6/12/2018 4:35:06 PM
Metadata
Fields
Template:
Address
House Number
1400
Street Name
Bracketts Point
Street Type
Road
Address
1400 Bracketts Point Road
Document Type
Land Use
PIN
1111723320025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prepared by a competent registered professional engineer to the City for approval by the City <br /> Engineer. The Developer shall instruct its engineer to provide adequate field inspection personnel <br /> to assure an acceptable level of quality control. In addition, the City may, at the City's discretion <br /> and at the Developer's expense, have one or more City inspectors and a soil engineer inspect the <br /> work as the City may reasonably determine. The Developer, its contractors and subcontractors, <br /> shall follow all instructions received from the City's inspectors. The Developer's engineer shall <br /> provide for on-site project management. The Developer's engineer is responsible for design <br /> changes and coniract administration between the Developer and the Developer's contractor. The <br /> Developer or its engineer shall schedule a pre-construction meeting at a mutually agreeable rime <br /> at the City Council chambers with all parties concerned, including the City staff, to review the <br /> program for the conshuction work. Within thirty (30) days after the completion of the <br /> Improvements and before the "security" is released, the Developer shall supply the City with a <br /> complete set of reproducible "as constructed" Plans, and an electronic file of the "as constructed" <br /> Plans in an auto CAD file based upon the Hennepin County coordinate system, all prepared in <br /> accordance with City standards. Developer will install any required sidewalks and trails just prior <br /> to the installation of the final lift of asphalt. <br /> 9. IRON MONUMENTS. In accordance with Minnesota Statutes Section 505.021 <br /> and the Orono City Code, the final placement of iron monuments for all lot corners must be <br /> completed before the "security" is released. T'he Developer's surveyor shall submit a written <br /> notice to the City certifying that the monuments have been installed. <br /> 10. PERMITS. The Developer shall obtain or require its contractors and <br /> subcontractors to obtain all necessary permits, including but not limited to the following to the <br /> extent required: <br /> 4 <br /> Southways V3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.