Laserfiche WebLink
prepared by a competent registered professional engineer to the City for approval by the City <br /> Engineer. The Developer shall instruct its engineer to provide adequate field inspection personnel <br /> to assure an acceptable level of quality control. In addition, the City may, at the City's discretion <br /> and at the Developer's expense, have one or more City inspectors and a soil engineer inspect the <br /> work as the City may reasonably determine. The Developer, its contractors and subcontractors, <br /> shall follow all instructions received from the City's inspectors. The Developer's engineer shall <br /> provide for on-site project management. The Developer's engineer is responsible for design <br /> changes and coniract administration between the Developer and the Developer's contractor. The <br /> Developer or its engineer shall schedule a pre-construction meeting at a mutually agreeable rime <br /> at the City Council chambers with all parties concerned, including the City staff, to review the <br /> program for the conshuction work. Within thirty (30) days after the completion of the <br /> Improvements and before the "security" is released, the Developer shall supply the City with a <br /> complete set of reproducible "as constructed" Plans, and an electronic file of the "as constructed" <br /> Plans in an auto CAD file based upon the Hennepin County coordinate system, all prepared in <br /> accordance with City standards. Developer will install any required sidewalks and trails just prior <br /> to the installation of the final lift of asphalt. <br /> 9. IRON MONUMENTS. In accordance with Minnesota Statutes Section 505.021 <br /> and the Orono City Code, the final placement of iron monuments for all lot corners must be <br /> completed before the "security" is released. T'he Developer's surveyor shall submit a written <br /> notice to the City certifying that the monuments have been installed. <br /> 10. PERMITS. The Developer shall obtain or require its contractors and <br /> subcontractors to obtain all necessary permits, including but not limited to the following to the <br /> extent required: <br /> 4 <br /> Southways V3 <br />