Laserfiche WebLink
14. EROSION CONTROL. Prior to initiating site grading,the storm water pollution <br /> prevention plan, and the erosion control plan shall be implemented by the Developer and <br /> inspected and approved by the City. The City may impose additional erosion control requirements <br /> if reasonably required. All areas disturbed by excavation and backfilling operations shall be <br /> reseeded within five (5) days after the completion of the work, weather permitting, or in an area <br /> that is inacrive for more than ten(10) days unless authorized and approved by the City Engineer. <br /> Except as otherwise provided in the erosion control plan, seed shall be in accordance with the <br /> City's current seeding specification which may include certified oat seed to provide a temporary <br /> ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc <br /> anchored as necessary for seed retention. The parties recognize that time is of the essence in <br /> controlling erosion. If the Developer does not comply with the erosion control plan and schedule <br /> or supplementary instructions received from the City, the City may take such action as it deems <br /> appropriate to control erosion. The City will endeavor to notify the Developer in advance of any <br /> proposed acrion,but failure of the City to do so will not affect the Developer's and City's rights or <br /> obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred <br /> for such work within ten (10) days, the City may draw down the "security" to pay any costs. No <br /> development, utility or street conshuction will be allowed and no building permits will be issued <br /> unless the Land is in full compliance with the approved erosion control plan. <br /> 15. GRADING PLAN. The Land shall be graded in accordance with the approved <br /> grading, drainage, and erosion control plan, Plan "B". The plan shall conform to City of Orono <br /> specifications. Within thirty (30) days after completion of the grading and before the City <br /> approves individual building permits the Developer shall �provide the City with an "as <br /> constructed" grading plan certified by a registered land surveyor or engineer that all ponds, <br /> 6 <br /> Southways V3 <br />