Laserfiche WebLink
Lindstrom leaning& Construction,Inc <br /> 9621 10th Ave e North <br /> Plymouth,Mn. 5441-5098 <br /> 763-544-8761 <br /> Fed TIN 41-08 7540 <br /> Hallway Height:8' <br /> Missing Wall-Goes to Floor 2'6"X 6'8" Opens into KITCHEN_LAUN <br /> Missing Wall-Goes to Floor 2'6"X 6'8" Opens into LIVING_ROOM_ <br /> Subroom: Closet(2) Height:8' <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 162. Mask per square foot for drywall or plaster work 27.49 SF @ 0.16= 4.40 <br /> 163. 5/8"-drywall per LF-up to 2'tall 15.17 LF @ 7.26= 110.13 <br /> 2'tall around entire room <br /> 164. Painter-per hour 0.25 HR @ 60.00= 15.00 <br /> labor to cut around all trim with brush <br /> 165. Seal the surface area w/latex based stain blocker-one coat 30.00 SF @ 0.50= 15.00 <br /> new drywall <br /> 166. Paint the walls-one coat 208.00 SF @ 0.54= 112.32 <br /> 167. Sheathing-plywood-3/4"CDX 27.49 SF @ 1.98= 54.43 <br /> 168. Linoleum floor covering(sheet goods) 57.50 SF @ 7.85= 451.38 <br /> 169. Baseboard-5 1/4" 15.17 LF @ 8.08= 122.57 <br /> Adjusted"Market Conditions"an;additional$4.30,as baseboards need to be custom milled to match up to existing.$4.30/LF is the <br /> additional material cost for custom milling. <br /> 170. Casing-2 1/4" 28.00 LF @ 1.72= 48.16 <br /> 171. Base shoe 15.17 LF @ 1.19= 18.05 <br /> 172. Seal&paint casing-two cgats 28.00 LF @ 1.21 = 33.88 <br /> 173. Paint door/window trim&j mb- 1 coat(per side) 4.00 EA @ 17.09= 68.36 <br /> door opening to room and window trim and jam as 3'piece of casing was detached during demolition <br /> 174. Paint door slab only- 1 coat(per side) 2.00 EA @ 19.97= 39.94 <br /> 175. Seal&paint baseboard,ove sized-two coats 15.17 LF @ 1.29= 19.57 <br /> 176. Paint baseboard,oversized-one coat 15.17 LF @ 0.84= 12.74 <br /> 177. Seal&paint base shoe or quarter round 15.17 LF @ 0.65= 9.86 <br /> 178. Final cleaning-construction-Residential 27.49 SF @ 0.18= 4.95 <br /> hallway2 Height:8' <br /> Missing Wall 3'X 8' Opens into Exterior <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 179. Painter-per hour 0.25 HR @ 60.00= 15.00 <br /> labor to cut around all trim with brush <br /> 180. Paint the walls-one coat 157.33 SF @ 0.54= 84.96 <br /> 181. Sheathing-plywood-3/4" DX 21.83 SF @ 1.98= 43.22 <br /> 182. Linoleum floor covering(sh et goods) 35.33 SF @ 7.85= 277.34 <br /> 183. Baseboard-5 1/4" 12.17 LF @ 8.08= 98.33 <br /> JUDY_&_GEORGE_REVISE 8/11/2016 Page: 12 <br />