My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01006 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0540 Old Crystal Bay Road South - 04-117-23-42-0030 - New PID
>
Permits/Inspections
>
2016-01006 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:27 PM
Creation date
3/26/2018 3:17:02 PM
Metadata
Fields
Template:
x Address Old
Address
0540 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723420030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lindstrom Cleaning& Construction,Inc <br /> 9621 10th Avenlue North <br /> Plymouth,Mn.$5441-5098 <br /> 763-544-8761 <br /> Fed TIN 41-0841540 <br /> CONTINUED-Kitchen/Laundry Room <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 141. Final cleaning-constructioIn-Residential 96.47 SF @ 0.18= 17.36 <br /> Bathroom Height:8' <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 142. Sheathing-plywood-3/4"C'DX 37.06 SF @ 1.98= 73.38 <br /> 143. Linoleum floor covering(shift goods) 36.17 SF @ 7.85= 283.93 <br /> 144. Vanity 2.50 LF @ 131.81 = 329.53 <br /> 145. Ductwork-hot or cold air 2.00 LF @ HVAC <br /> under cabinet heat run with toekic register in vanity <br /> 146. Heat/AC register-Mechanically attached 1.00 EA @ HVAC <br /> 147. Detach&Reset Vanity top-one sink-cultured marble 1.25 LF @ 48.50= 60.63 <br /> reset only <br /> 148. Detach&Reset Sink faucet Bathroom 0.50 EA @ PLUMBING <br /> reset only <br /> 149. P-trap assembly-ABS(plastc) 1.00 EA @ PLUMBING <br /> 150. Angle stop valve 2.00 EA @ PLUMBING <br /> 151. Baseboard-5 1/4" 11.00 LF @ 8.08= 88.88 <br /> Adjusted"Market Conditions"an additional$4.30,as baseboards need to be custom milled to match up to existing.$4.30/LF is the <br /> additional material cost for custom milling. <br /> 152. Base shoe 11.00 LF @ 1.19= 13.09 <br /> 153. Painter-per hour 0.25 HR @ 60.00= 15.00 <br /> labor to cut around all trim with b sh <br /> 154. Paint door/window trim&ja b- 1 coat(per side) 1.00 EA @ 17.09= 17.09 <br /> 155. Paint door slab only- 1 coat(per side) 1.00 EA @ 19.97= 19.97 <br /> 156. Seal&paint baseboard,over ized-two coats 15.00 LF @ 1.29= 19.35 <br /> 157. Paint baseboard,oversized-clne coat 15.00 LF @ 0.84= 12.60 <br /> 158. Seal&paint base shoe or quarter round 15.00 LF @ 0.65= 9.75 <br /> 159. Seal&paint paneling 32.00 SF @ 0.97= 31.04 <br /> 160. Toilet-Detach&reset 0.50 EA @ PLUMBING <br /> reset only <br /> 161. Final cleaning-construction-Residential 37.06 SF @ 0.18= 6.67 <br /> JUDY_&_GEORGE_REVISE 8/11/2016 Page: 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.