My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01006 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0540 Old Crystal Bay Road South - 04-117-23-42-0030 - New PID
>
Permits/Inspections
>
2016-01006 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:27 PM
Creation date
3/26/2018 3:17:02 PM
Metadata
Fields
Template:
x Address Old
Address
0540 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723420030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lindstrom Cleaning& Construction,Inc <br /> 9621 10th Avenjue North <br /> Plymouth,Mn. 5441-5098 <br /> 763-544-8761 <br /> Fed TIN 41-08 7540 <br /> CONTINUED-hallway2 <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> Adjusted"Market Conditions"and additional$4.30,as baseboards need to be custom milled to match up to existing.$4.30/LF is the <br /> additional material cost for custom milling. <br /> 184. Base shoe 12.17 LF @ 1.19= 14.48 <br /> 185. Paint door/window trim&jamb- 1 coat(per side) 4.00 EA @ 17.09= 68.36 <br /> includes both sides of hallway closet door jam and trim <br /> 186. Paint door slab only- 1 coa (per side) 4.00 EA @ 19.97= 79.88 <br /> includes both sides of hallway closet door slab <br /> 187. Seal&paint baseboard,oversized-two coats 12.17 LF @ 1.29= 15.70 <br /> 188. Paint baseboard,oversized;one coat 12.17 LF @ 0.84= 10.22 <br /> 189. Seal&paint base shoe or quarter round 12.17 LF @ 0.65= 7.91 <br /> 190. Seal&paint closet shelving-single shelf 1.00 EA @ 41.83= 41.83 <br /> 2 shelves in hallway cove <br /> 191. Final cleaning-construction-Residential 21.83 SF @ 0.18= 3.93 <br /> Storage Height:8' <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 192. Painter-per hour 0.15 HR @ 60.00= 9.00 <br /> labor to cut around all trim with b sh <br /> 193. Paint the walls-one coat 124.00 SF @ 0.54= 66.96 <br /> 194. Sheathing-plywood-3/4" DX 14.10 SF @ 1.98= 27.92 <br /> 195. Linoleum floor covering(sh et goods) 39.33 SF @ 7.85= 308.74 <br /> 196. Baseboard-5 1/4" 10.00 LF @ 8.08= 80.80 <br /> Adjusted"Market Conditions"an dditional$4.30,as baseboards need to be custom milled to match up to existing.$4.30/LF is the <br /> additional material cost for custo milling. <br /> 197. Base shoe 10.00 LF @ 1.19= 11.90 <br /> 198. Paint door/window trim&j mb- 1 coat(per side) 1.00 EA @ 17.09= 17.09 <br /> includes both sides of hallway clo et door jam and trim <br /> 199. Paint door slab only- 1 coat(per side) 1.00 EA @ 19.97= 19.97 <br /> includes both sides of hallway clo et door slab <br /> 200. Seal&paint baseboard,ove sized-two coats 10.00 LF @ 1.29= 12.90 <br /> 201. Paint baseboard,oversized- ne coat 10.00 LF @ 0.84= 8.40 <br /> 202. Seal&paint base shoe or qu rter round 10.00 LF @ 0.65= 6.50 <br /> 203. Final cleaning-construction-Residential 14.10 SF @ 0.18= 2.54 <br /> JUDY_&_GEORGE_REVISE 8/11/2016 Page: 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.