Laserfiche WebLink
C. Contractor shall remove and replace shrubs found to be dead or in unhealthy condition <br /> during the guarantee period. Make replacements immediately or during the next growth <br /> season as appropriate. <br /> 1. All replacements shall be plants of the same kind and size as specified in the Plant <br /> Materials Schedule. Replacement costs shall be borne by the Contractor. <br /> 2. Each replacement planting required at the end of the guaranty period shall be <br /> guaranteed for one year from date of installation,and itself is subject to replacement <br /> and guarantee. Replacement plants are subject to inspection and rejection by the <br /> Architect before and after planting. <br /> D. Inspection: At the end of the guarantee period,inspection will be made by the Architect <br /> upon written notice by the Contractor at least five days prior to the end of the guarantee <br /> period. Any shrub required under this contract that is dead or not in satisfactory <br /> condition,as determined by the Architect shall be removed from the site,and shall be <br /> replaced as soon as conditions permit during the planting season. <br /> END OF SECTION <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 02950- 11 <br />