Laserfiche WebLink
SECTION 03100 <br /> CONCRETE FORMWORK <br /> PART 1 GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Responsibility for design,engineering,construction,maintenance and safety of <br /> removable formwork. <br /> 2. Formwork required for cast-in-place concrete,with shoring,bracing and anchorage. <br /> 3. Items, materials,operations and methods including labor,equipment and incidentals. <br /> 4. Coordinate installation of items furnished under other sections. <br /> B. Related Sections: <br /> 1. Section 03200-Concrete Reinforcement <br /> 2. Section 03250-Concrete Accessories <br /> 3. Section 03300-Cast-in-Place Concrete <br /> 1.2 . REFERENCES <br /> A. Removable Forms: <br /> 1. ACI 301 -Specification for Structural Concrete for Buildings. <br /> 2. ACI 318 -Building Code Requirements for Reinforced Concrete. <br /> 3. ACI 347 -Recommended Practice for Concrete Formwork. <br /> 4. PS 1 -Construction and Industrial Plywood. <br /> 1.3 QUALITY ASSURANCE <br /> A. Applicable Standards: ACI 347 "Recommended Practice for Concrete Formwork"and <br /> ACI 301 "Specifications for Structural Concrete for Buildings",Chapter 4. <br /> B. Allowable Tolerances: Design, construct and maintain formwork to insure completed <br /> work within tolerance limits specified in Table 4.3.1 of ACI 301 and Article 3.3 of ACI <br /> 347 with stipulation that no tolerances specified for horizontal or vertical building lines or <br /> footings should be construed to permit encroachment beyond legal boundaries. <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 03100- 1 <br />