My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. All mulch products(2 lb.bag). <br /> 2. Soil separator mat. <br /> 3. Planting soil(5 lb.bag). <br /> D. Quality Control Submittals: <br /> 1. Submit certificates upon product arrival on site and prior to use or installation. <br /> a. Analysis and standards: Deliver standard products with manufacturer's certified <br /> analysis. <br /> b. For planting soils,provide analysis by recognized laboratory made in accordance <br /> with methods established by the Association of Official Agriculture Chemists. <br /> c. Nursery stock shall meet the American Standard for Nursery Stock,ANSI S60.1, <br /> of the American Association of Nurserymen,Incorporated as to grading and <br /> quality. They shall be true to type and name in accordance with Standardized <br /> Plant Names,most recent edition. <br /> d. Provide healthy,vigorous stock free of disease,insects,eggs,larvae and free of <br /> defects such as knots,sun-scale,injuries,abrasions or disfigurement. <br /> e. Sizes: Provide plants of sizes shown on Plant Materials Schedule. Plants of <br /> larger size may be used if acceptable to Architect. <br /> f. Deliver standard products in original package labeled with manufacturer's name, <br /> product name,weight,certified analysis and instructions for use. <br /> 2. Contractor's Field Reports. Submit monthly report indicating any soil loss,drainage <br /> problems,poor maintenance,vandalism,insect damage,disease or any other damage <br /> or unhealthy conditions for any plant to Architect. <br /> 3. Substantial Completion: <br /> a. Submit letter of completion to Architect upon Substantial Completion of work <br /> indicating: <br /> 1) Finished work. <br /> 2) Unmet specifications;explanation. <br /> 3) Unfinished work;explanation. <br /> 4) Schedule for completion. <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 02950-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.