My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02950 <br /> PLANTING <br /> PART 1 GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Plants,planting and necessary planting operations including watering and pruning. <br /> 2. Replacement of unsatisfactory plant material. <br /> 3. Protection,maintenance and guarantee of work. <br /> B. Carefully examine all of the Contract Documents for requirements which affect the work <br /> of this Section. Other specification sections which directly relate to the work of this <br /> section include,but are not limited to,the following: <br /> 1. Earthwork: Section 02200. <br /> 2. Turf: Section 02930. <br /> 3. Pond Area Seed: Section 02931. <br /> C. Nursery stock shall comply with the current edition of the American Standard for Nursery <br /> Stock,ANSI S60.1,of the American Association of Nurserymen,Incorporated. <br /> 1.2 DEFINITIONS <br /> A. The term plant shall mean any or all trees, shrubs vines,groundcovers or perennials <br /> specified. <br /> 1.3 SUBMTTTALS <br /> A. Product Data: Submit product data,schedules and certificates in accordance with Section <br /> 01300 Submittals. <br /> B. Submit work schedule prior to start of work. Include the following: <br /> 1. Installation schedule. <br /> 2. Plant maintenance and watering schedule. <br /> C. Samples: Submit product data and samples of the following: <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 02950- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.