My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Cultivate and till organic topsoil to a minimum depth of 3" until it is uniformly <br /> friable. <br /> 2. Rake and level to provide organic topsoil which is smooth,without hollows and has a <br /> fine earth surface. <br /> 3. Correct soft spots and grade irregularities. <br /> 4. Pick up and remove sticks,branches,stones and other debris. <br /> B. Seeding: Seed planting methodology shall be by see drill that will accurately meter the <br /> type of seedds to be planted and keep al seeds uniformly mixed during drilling. The drill <br /> shall be equipped with disk furrow appears and packer assembly to compact the soil <br /> directly over the seed row. All drill seeding shall be done at a right angle to surface <br /> drainage. The ultimate responsibility for successful growth and coverage is solely the <br /> Contractor's;extreme for precipitation or temperature do not constitute a basis for any <br /> condition of turf establishment less than the described intent. <br /> 3.4 MAINTENANCE AND ACCEPTANCE <br /> A. Seed: For acceptance,seeded areas shall present a uniform stand of growth. Scattered <br /> bare spots,none larger than one sq. ft.,will be accepted,but such bare spots shall not <br /> exceed 1% of any defmable area. <br /> B. Maintenance of seeded areas shall continue until a healthy stand of growth results. <br /> Maintenance shall include,but not be limited to,the following: <br /> 1. At areas adjacent to pond,water three times weekly,unless adequate rainfall has <br /> occurred within previous three days. <br /> 2. Re-seed as required to meet desired and intended results of healthy growth. <br /> C. Pond Area Seed: After seeding within the pond perimeter area is complete,the water <br /> level shall be established and maintained at a level 12"below design overflow;the intent <br /> is to keep the seed bed wet but not flooded during seed germination and initial growth. <br /> Once the marsh vegetation is established,the water level can be progressively raised to <br /> design overflow level. Temporary control of the water level below design overflow may <br /> require pumping of water during this critical period. <br /> END OF SECTION <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 02931 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.