Laserfiche WebLink
C. All storm and sanitary sewer lines servicing the building shall be pressure tested at 5 psi <br /> for 15 minutes or in accordance with the applicable plumbing code whichever test has <br /> greater requirements. <br /> D. All storm and sanitary sewer lines servicing parking lot and yard areas shall be pressure <br /> tested at 5 psi for 15 minutes or in accordance with the applicable plumbing <br /> code,whichever test has greater requirements.The contractor has the option of providing a <br /> contract inspector for observation and certification for these lines in lieu of the pressure <br /> test noted above. <br /> E. The general contractor shall witness and submit the recorded test results to the Owner and <br /> Architect/Engineer. <br /> END OF SECTION <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 02720-7 ' <br />