My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02600 <br /> WATER SYSTEMS <br /> PART 1 GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: <br /> 1. Staking and alignment. <br /> 2. Excavation,backfilling and compaction of trenches. <br /> 3. Protective provisions including sheeting,shoring,bracing,pumping and bailing. <br /> 4. Pipe Materials,appurtenances,etc.including installation. <br /> 5. Hydrostatic/Leakage testing. <br /> 6. Disinfection of water in piping mains and testing. <br /> 7. Testing to comply with Health Department requirements and local and county <br /> government regulations. <br /> 8. Notification of city inspector and payment of fees as applicable. <br /> 9. Water systems as specified herein includes all water works outside the building <br /> perimeter plus the penetration of the building wall to the first mechanical pipe joint; <br /> penetration of wall shall include sleeve and appropriate seal. <br /> B. Related Sections: <br /> 1. Section 02200-Earthwork. <br /> 2. Section 02220-Trenching and Backfilling. <br /> 3. Section 15200- Interior Water Supply System. <br /> 1.2 QUALITY ASSURANCE <br /> A. Furnish new,best quality pipes, fittings,valves, hydrants,etc. of weight and dimensions <br /> as specified. <br /> B. Utilize equipment of proper size and in good working condition to prosecute the work to <br /> full completion in a satisfactory manner. <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 02600- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.