Laserfiche WebLink
8. Ambient temperature when concrete sample was made. <br /> 9. Date delivered to laboratory and date tested. <br /> 10. The results of companion cylinders(accelerated strength testing)shall be included <br /> when applicable. <br /> 11. A copy of the test reports that include companion cylinder test results shall be <br /> furnished to the Architect/Engineer. <br /> END OF SECTION <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 02515 - 8 <br />