My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
square foot of face area each. <br /> 3. Retaining wall units shall provide a minimum of 100 psf of wall face area. Fill which is <br /> contained within the dimensions of the units may be considered as 80%effective <br /> weight. <br /> 4. Exterior face shall be textured. Color shall approximate building color.. <br /> 5. The units shall be positively interlocked. <br /> B. Select Granular Fill: Base material and unit fill shall consist of free draining fill;gradation <br /> shall include material with fines limited to 5%passing the #200 sieve, and less than 50% of <br /> material passing the#40 sieve. <br /> C. Backfill: Material shall be granular borrow as specified in Specification Section 02200. <br /> PART 3 EXECUTION <br /> 3.1 FOUNDATION SOIL PREPARATION <br /> A. Foundation soil shall be excavated to the lines and grades as shown on the construction <br /> drawings or as directed by the Testing Laboratory representative. <br /> B. Foundation soil shall be examined by the Testing Laboratory representative to assure that <br /> the actual foundation soil strength meets or exceeds a design strength of 2000 psf. <br /> C. Over-excavated areas shall be filled with compacted granular material. <br /> ' D. Foundation soil shall be proof-rolled prior to fill placement. <br /> 3.2 BASE PREPARATION <br /> A. Base shall be placed as shown on the construction drawings with a minimum thickness of <br /> 6". <br /> B. Base materials shall be installed upon compacted granular borrow or undisturbed native <br /> soils. <br /> C. Material shall be compacted so as to provide a level, hard surface on which to place the <br /> first course of units. Compaction shall be with mechanical plate compactors to 95% of <br /> Standard Proctor Density(ASTM D698) <br /> D. Base shall be prepared to ensure complete contact of retaining wall unit with base. Gaps <br /> shall not be allowed. <br /> E. Base materials shall be to the depths and widths shown. <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 02270 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.