My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
action as noted below shall be at the discretion of the testing laboratory representative. <br /> Testing shall include hand auger penetrations, one penetration for every 30 feet of <br /> trench. <br /> a. If soils beneath the trench bottom exhibit competency similar to moderately well <br /> consolidated mineral soils, the installation of pipes and structures need only <br /> incorporate normal bedding requirements. <br /> b. If soils beneath the trench bottom exhibit general competency with some limited <br /> local zones of soft or compressible materials,. subcut excavation and installation <br /> of pipe trench stabilization is required. If trench bottom exhibits a general <br /> condition of soft or compressible materials, a general application of subcut <br /> excavation and pipe trench stabilization is required. <br /> The additional excavation(subcut excavation) and placement of pipe trench stabilization <br /> when recommended by the testing laboratory representative, shall be considered as extra <br /> work and compensated for per unit price. . <br /> 3. Excavation for Structures: Excavation for manholes or similar structures shall provide <br /> at least 12 inch clearance between structure face and excavation. <br /> 4. Temporary Provisions: Where existing active sewers are encountered during <br /> trenching, provide adequate provisions to divert flow or pump as necessary to <br /> maintain operational function and provide dry work area. <br /> 5. Sheeting and Shoring: Except where trench banks are cut back at stable slopes, trench <br /> excavations shall be sheeted, braced and shored as necessary to provide protection for <br /> workmen, pipe and structures. <br /> 3.5 BACKFILL <br /> A. Stabilization Aggregate: <br /> 1. Line unstable trench with geotextile fabric, providing enough fabric so that aggregate <br /> can be fully wrapped as detailed. <br /> 2. Place stabilization aggregate material in maximum loose lifts of 6", and mechanically • <br /> compact each lift until there is no further evidence of consolidation. <br /> B. Pipe Bedding: <br /> 1. Place pipe bedding material in maximum loose lifts of 6". <br /> 2. Compact each lift to 98% Standard Proctor Density(ASTM D698). <br /> 3. Test compaction every 200 lineal feet of trench. <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 02220 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.