3.4 EXCAVATION <br /> A. General Excavation: <br /> 1. General excavation shall include all materials of every nature and description <br /> encountered in obtaining lines and grades shown on Drawings. It is assumed that the <br /> materials can be removed by power shovel, crawler tractor, scraper or other <br /> equipment normal to excavation work, but not requiring the use of drills or blasting. <br /> 2. All excavations shall be made to the proper depth with the proper allowance made for <br /> materials to follow. <br /> 3. All select suitable materials removed from the excavation shall be used as far as <br /> practicable in the context of allowable applications. <br /> 4. Contractor shall, at his own expense, form all dams, construct temporary ditches, <br /> pump or do whatever other work is necessary during the progress of the work to keep <br /> excavations area free of water at all times. <br /> 5. All unsuitable material encountered in excavation areas where some type of loading <br /> will be superimposed shall be removed. <br /> 6. If in the prosecution of the Work it is necessary to interrupt existing surface drainage, <br /> sewers, or underdrainage, the Contractor shall provide and maintain temporary <br /> drainage facilities until permanent facilities are completed. <br /> 7. Refer to this Specification for disposal of unsuitable materials and excess materials. <br /> 8. Contract amounts will not be adjusted for unauthorized over excavation. <br /> B. Building Area Excavation: <br /> 1. Excavate the building area to subgrade elevations as follows: <br /> Footings: See structural drawings. <br /> Rink Area Floor: 1001.5 <br /> Lower Floor: 1002.9 <br /> Upper Floor: 1005.6 <br /> Sloped Seating Area: As required to provide 12" granular cushion beneath <br /> underside of concrete. <br /> 2. Once design sub-grade elevation as been achieved,the testing laboratory shall observe <br /> and test the subgrade as to its competency. If additional subcut is required beneath <br /> footing elevation to remove soft or unstable soils as determined by the testing <br /> laboratory representative, said subcut shall include lateral oversizing at a 1:1 ratio; i.e. <br /> each additional foot of excavation depth shall include an equal lateral increase. <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 02200 - 9 <br />