My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Water: Exercise particular effort to provide temporary grading to divert surface water <br /> from excavations. Provide and maintain pumps, well points, sumps, suction and discharge <br /> lines, and other dewatering systems necessary for the conveyance of water to approved run <br /> off'disposal provisions. <br /> D. Site Erosion Control: The following criteria shall apply to construction activities that <br /> result in run-off leaving the site: <br /> 1. Channelized runoff from adjacent areas passing through the site shall be diverted <br /> around disturbed areas, if practical. Otherwise, the channel shall be protected as <br /> described below. Diverted runoff shall be conveyed in a manner that will not erode the <br /> conveyance and receiving channels. <br /> 2. All activities on the site shall be conducted in a logical sequence to minimize the area <br /> of bare soil exposed at any one time. <br /> 3. Runoff from the entire disturbed area on the site shall be controlled by meeting one or <br /> more of the following: <br /> a. All disturbed ground left inactive for 14 or more days shall be stabilized by <br /> seeding and mulching, mulch covering or other equivalent control measure. <br /> b. Silt fences, straw bales, or equivalent control measure shall be placed along all <br /> sideslope and downslopes side of the site. If channel or area of concentrated <br /> runoff passes through the site, silt fences shall be placed along the channel edges <br /> to reduce sediment reaching channel. The use silt fences, straw bales, or <br /> equivalent control measures shall include maintenance and inspection. <br /> c. Siltation fence installation shall include anchoring the bottom edge as detailed on <br /> the grading plan. Posts shall be 2"x 2" pine or steel posts located 4" o.c. <br /> 4. Any soil or dirt storage piles containing more than ten cubic yards of material should <br /> not be located with a downslope drainage length of less than 25'from the toe of the <br /> pile to a roadway or drainage channel. If remaining for more than seven days, it shall <br /> be stabilized by mulching, vegetative cover, tarps or other means. Erosion from soil <br /> piles which will be in existence for less than seven days shall be controlled by placing <br /> straw bales or silt fence barriers around pile. All storm drains shall be protected with <br /> straw bales or other filtering barriers. <br /> E. Winter Construction: During cold weather, stripping, scarification, fill placement and <br /> compaction shall be performed as rapidly as possible to minimize potential problems <br /> associated with placement and compaction of frost susceptible soil. <br /> F. Tree Protection: Protect trees indicated to remain by the following methods: <br /> 1. Construct a box of 8'minimum height that encompasses the tree trunk. <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 02200 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.