Laserfiche WebLink
2.6 ALTERNATE NO. 6: Contractor to provide a price to delete base cabinets and upper <br /> cabinets at Rooms 08 and 10. Delete sinks. <br /> 2.7 ALTERNATE NO. 7: Contractor to provide a price to delete/add alternate finish for <br /> precast panels(refer to Section 03410, Article 2.3, paragraph C.3. <br /> 2.8 ALTERNATE NO. 8: Contractor to provide a price to delete entrance trellis(refer to <br /> details 9, 10, 11, sheet A202). Delete steel tube trellis assembly, concrete curb, and <br /> concrete footing associated with trellis assembly. <br /> 2.9 ALTERNATE NO. 9: Contractor to provide a price to provide rough in only for locker <br /> room plumbing fixtures. Waste piping shall be capped above the floor with provisions for <br /> future connection. Provide a protective cap over each waste pipe that extends through the <br /> floor. Cap shall be firmly anchored to the floor to protect the waste pipe. Provide capped <br /> vents extending through the roof for future connection. Valve and cap domestic hot and <br /> cold water piping branches at mains. <br /> 2.10 ALTERNATE NO. 10: Contractor to provide a price to delete dual level lighting fixtures <br /> and provide single level fixtures of same manufacturer and wattage in Room 11B. <br /> END OF SECTION <br /> ADDENDUM#2 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 01030- 2 <br />