Orono Schools <br /> STS Project#95723-XA <br /> April 1993 <br /> /2.03 Supply and Return Lines - The tank will service boilers located in the boiler room. Supply <br /> and return lines shall consist of nominal 2 inch diameter double walled fiberglass pipe. The <br /> Contractor shall provide all necessary hardware to make necessary connections between <br /> existing piping within the building and the new piping. All piping shall be UL listed for use <br /> with petroleum products. <br /> Connections into the containment system lines shall be a Teleflex flexible connection or <br /> equivalent approved by the Engineer. A Teleflex flexible connection shall also be provided <br /> at the exterior of the building wall for both the supply and return lines. In addition, a "boot" <br /> containment sleeve shall be used to protect the flexible connection and the secondary <br /> containment piping. <br /> 2.04 Overfill Equipment - The tank system shall be equipped with overfill equipment. The <br /> overfill system shall be an overfill valve installed within the fill pipe which will be activated <br /> once 95% of tank capacity has been reached. The overfill system proposed shall be shown <br /> on the fabrication drawing and be approved by the Engineer prior to installation. <br /> /2.05 Tank Level Monitoring Equipment - The Contractor shall supply and install a tank level <br /> monitor at the site. The tank level monitor shall be a Veeder-Root TLS-350, Gilbarco Tank <br /> Monitor 3, or equivalent, with a printer and magnetostrictive probes. The Engineer will <br /> evaluate equivalent tank level monitor equipment. The Contractor shall submit <br /> manufacturer's literature on the tank level monitoring equipment with the bid form if an <br /> equivalent is proposed. The monitor console will be installed inside the boiler room as <br /> shown on Figure 3A. The Contractor is responsible for providing the electrical connection <br /> from the sender to the console. The Contractor is responsible for providing the electrical <br /> connection from the breaker box to the console. The Contractor is responsible for <br /> identification of the electrical supply locations during the pre-bid meeting. The Contractor <br /> is responsible for installing, calibrating and making operational the monitoring equipment. <br /> 2.06 Piping Sump Sensor - The Contractor shall supply and install a piping sump sensor. The <br /> piping sump sensor shall be a "float type" sensor. The sump sensor shall be installed <br /> approximately 2 inches from the base of the sump floor. The Engineer will evaluate <br /> proposed equivalent piping sump sensors. The connections between the sender and the <br /> jmonitor shall be made in accordance with the manufacturer's specifications. <br /> 2.07 Tank Anchoring - The Contractor shall mechanically anchor the underground storage tank. <br /> Anchoring shall be accomplished using deadman anchors. Figure 5A in Appendix A shows <br /> the detail for the construction of deadman anchors. The Contractor shall supply and install <br /> the deadman anchors and the associated hold-down straps in accordance with STI-P3 <br /> specifications. <br /> 13215-3 <br />