My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-005331 - remove oil tank
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0765 Old Crystal Bay Road North - 33-118-23-21-0001
>
Permits/Inspections
>
1993-005331 - remove oil tank
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:47:52 PM
Creation date
3/13/2018 11:45:37 AM
Metadata
Fields
Template:
x Address Old
House Number
765
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
765 Old Crystal Bay Road North
Document Type
Permits/Inspections
PIN
3311823210001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orono Schools <br /> STS Project#95723-XA <br /> April 1993 <br /> Sieve Size Percent Passing <br /> 3/4 inch 100 <br /> No. 4 95 - 100 <br /> No. 200 0 - 5 <br /> B. If required, any non-select imported backfill should meet the following gradation: <br /> Sieve Size Percent Passing <br /> 3 inch 100 <br /> 1 inch 90 - 100 <br /> No. 4 50 - 100 <br /> No. 200 0 - 20 <br /> 2.02 Storage Tank <br /> A. The Contractor shall supply the fuel oil storage tank for this project. The storage tank <br /> shall be an STI-P3 single-walled tank, have a nominal diameter of 9 feet and a nominal <br /> length of 21 feet. The nominal capacity shall be 10,000 gallons. <br /> 1. Lifting lugs shall be provided on the tank for proper installation. <br /> 2. Appropriate openings shall be provided for installation of the piping into the <br /> containment system. <br /> 3. The tank exterior shall be prime coated and a coat of epoxy base paint applied on <br /> the exterior surface as per STI-P3 specifications. All painting shall be performed by <br /> the tank manufacturer at the time of fabrication. Where the painted surface is <br /> damaged during transportation or installation, the Contractor shall be responsible <br /> for repainting the damaged areas with the same epoxy base paint. <br /> 4. The tank shall be designed and fabricated in compliance with STI-P3 specifications <br /> and UL 58 code. The tank shall be cathodically protected. <br /> 5. The tank shall be equipped with a containment system specified in Item 2.09 of this <br /> Section. <br /> 6. Fabrication drawings of the tank shall be submitted and approved by the Engineer <br /> prior to installation. <br /> 13215-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.