My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Examine walls, floors, roof, and plumbing chases for suitable conditions where piping and specialties are to be <br /> installed. <br /> E. Review soil testing information provided to verify conditions are suitable for piping installations. <br /> F. Do not proceed until unsatisfactory conditions have been corrected. <br /> 3.02 PREPARATION OF FOUNDATION FOR UNDERGROUND BUILDING DRAINS <br /> A. Grade trench bottoms to provide a smooth,firm,and stable foundation,free from rock,throughout the length of the <br /> pipe. <br /> B. Remove unstable, soft, and unsuitable materials at the surface upon which pipes shall be laid, and backfill with <br /> clean sand or pea gravel to indicated invert elevation. <br /> C. Shape bottom of trench to fit the bottom%:of the circumference of pipe. Fill unevenness with tamped granular sand <br /> backfill. At each pipe joint dig bell holes to relieve the bell of the pipe of all loads, and to ensure continuous <br /> bearing of the pipe barrel on the foundation. <br /> 3.03 JOINING PIPES AND FITTINGS <br /> A. Cast-Iron Soil Pipe: Make compression joints and hubless joints in accordance with the recommendations in the <br /> CISPI Cast Iron Soil Pipe and Fittings Handbook,Chapter IV. <br /> B. PVC DW V Pipe: Joining and installation of PVC drainage pipe and fittings shall conform to ASTM D2665. <br /> 3.04 INSTALLATION <br /> A. Refer to Section 15050"Basic Mechanical Materials and Methods",for general piping installation instructions. <br /> B. Install supports and anchors in accordance with Section 15050 "Basic Mechanical Materials and Methods" and <br /> Section 15140"Supports and Anchors". <br /> C. Make changes in direction for drainage and vent piping using appropriate 45-degree wyes,half-wyes,or long sweep <br /> quarter, sixth, eighth, or sixteenth bends. Sanitary tees or short quarter bends may be used on vertical stacks of <br /> drainage lines where the change in direction of flow is from horizontal to vertical. No change in direction of flow <br /> greater than 90 degrees shall be made. Where different sizes of drainage pipes and fittings are connected, use <br /> proper size,standard increasers and reducers. Reduction of the size of drainage piping in the direction of flow is <br /> prohibited <br /> D. Install underground building drains to conform with plumbing code,and in accordance with the Cast Iron Soil Pipe <br /> Institute Engineering Manual. Lay underground building drains beginning at low point of systems, true to grades <br /> and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream Install <br /> required gaskets in accordance with manufacturer's recommendations for use of lubricants, cements, and other <br /> special installation requirements. Maintain swab or drag in line and pull past each joint as it is completed <br /> E. Install building drain pitched down at minimum slope of 1/4" per foot(2 percent) for piping 3" and smaller, and <br /> 1/8"per foot(1 percent)for piping 4"and larger,or as indicated on plans. <br /> F. Extend building drain to connect to sewer piping, of size and in location indicated for service entrance to building. <br /> Sewer piping is specified in a separate section of Division 2. <br /> G. Install sleeve and mechanical sleeve seal at penetrations through foundation wall for watertight installation. <br /> 15413-4 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.