My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.04 SUBMITTALS <br /> A. Refer to Division 1 and Division 15, Section 15010 Basic Mechanical Requirements for administrative and <br /> procedural requirements for submittals. <br /> B. Product Data: Submit manufacturer's product data for the following products: <br /> 1. Drainage piping specialties <br /> 2. Roof drains <br /> C. Quality Control Submittals: <br /> 1. Submit reports specified in Part 3 of this Section. <br /> 1.05 COORDINATION OF DRAWINGS <br /> A. Prepare coordination drawings in accordance with the requirements of Section 15010 "Basic Mechanical <br /> Requirements". In addition to the requirements specified above,refer to specific sections of the specifications for . <br /> additional coordination documentation. <br /> 1.06 QUALITY ASSURANCE <br /> A. Codes and Standards: <br /> 1. Plumbing Code Compliance: Comply with applicable portions of Minnesota Plumbing Code. <br /> 1.07 DELIVERY,STORAGE,AND HANDLING <br /> A. Store pipe in a manner to prevent sagging and bending. <br /> B. Do not store PVC or ABS pipe and fittings indirect sunlight for long.periods. <br /> 1.08 SEQUENCING AND SCHEDULING <br /> A. Coordinate the installation of roof drains,flashing,and roof penetrations. <br /> B. Coordinate flashing materials installation for roofing,waterproofing,and adjoining substrate work. <br /> C. Coordinate with installation of storm sewer systems as necessary to interface building drains with drainage piping <br /> systems. <br /> PART 2: PRODUCTS <br /> 2.01 MANUFACTURERS <br /> A. Manufacturer Uniformity: Conform with the requirements specified in Division 15, Section 15010 Basic <br /> Mechanical Requirements,under"Product Options." <br /> B. Subject to compliance with requirements,provide drainage systems from one of the following: <br /> 15413-2 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.