My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NPS LENGTH THICKNESS <br /> 1/4 THROUGH 3-1/2 12 0.048 <br /> 4 12 0.060 ' <br /> 5&6 18 0.060 <br /> 8 THROUGH 14 24 0.075 <br /> 4. Insert material shall be at least as long as the protective shield <br /> 5. Thermal Hanger Shields: Install where indicated,with insulation of same thickness as piping. <br /> J. Locate hangers at maximum 10'-0"on center at 8"dia.and larger pipes supported from steel joints. Locate hangers <br /> at joist panel points. <br /> 3.03 INSTALLATION OF ANCHORS <br /> A. Install anchors at proper locations to prevent stresses from exceeding those permitted by ASME B31.9 and to <br /> prevent transfer of loading and stresses to connected equipment. , <br /> B. Fabricate and install anchors by welding steel shapes, pleates, and bars to piping and to structure. Comply with <br /> ASME B31.9 and with AWS Standards D 1.1. <br /> C. Where expansion compensators are indicated, install anchors in accordance with expansion unit manufacturer's ' <br /> written instructions to control movement to compensators. <br /> D. Anchor Spacings: Where not otherwise indicated, install anchors at ends of principal pipe runs, at intermediate <br /> points in pipe runs between expansion loops and bends. Make provisions for preset of anchors as required to <br /> accommodate both expansion and contraction of piping. <br /> 3.04 INSTALLATION OF PIPE ALIGNMENT GUIDES <br /> A. Install pipe alignment guides on piping that adjoins expansion joints and elsewhere as indicated. ' <br /> B. Anchor to building substrate. <br /> 3.05 EQUIPMENT SUPPORTS ' <br /> A. Fabricate structural steel stands to suspend equipment from structure above or support equipment above floor. <br /> B. Grouting: Place grout under supports for PiP•mg and equipment ' <br /> 3.06 METAL FABRICATION ' <br /> A. Cut, drill, and fit miscellaneous metal fabrications for pipe anchors and equipment supports. Install and align <br /> fabricated anchors in indicated locations. <br /> B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded ' <br /> because of shipping size limitations. <br /> C. Field Welding: Comply with AWS D1.1 for procedures of manual shielded metal-arc welding, appearance and <br /> quality of welds made,methods used in correcting welding work,and the following: <br /> 1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base <br /> metals. <br /> 2. Obtain fusion without undercut or overlap. <br /> 151404 No.[COMM] ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.