Laserfiche WebLink
8. Install clean filters. <br /> 9. Verify manual and automatic volume control,and fire and smoke dampers in connected ductwork systems are <br /> in the full-open position. <br /> 10. Disable automatic temperature control operators. <br /> B. Starting procedures for central-station air-handling units: <br /> 1. Energize motor,verify proper operation of motor,drive system,and fan wheel. Adjust fan to indicated RPM. <br /> a. Replace fan and motor pulleys as required to achieve design conditions. <br /> 2. Measure and record motor electrical values for voltage and amperage. <br /> C. Shut unit down and reconnect automatic temperature control operators. <br /> D. Refer to Division 15 Section 15990 "Testing, Adjusting, and Balancing" for procedures for air-handling-system <br /> testing,adjusting,and balancing. <br /> 3.08 TEMPORARY OPERATION <br /> A. Manually operate air handling systems to provide suitable environment for installation of interior finishes. Perform <br /> commissioning operations prior to starting units. Follow commissioning starting procedures and the following <br /> manual operation sequence: <br /> 1. Open outdoor air dampers,close return air dampers,open all air terminals to full open. Verify filters installed, <br /> heating coil operating (outdoor air temperatures below 40° F), condensate drain fimctioning, and electrical <br /> protection devices installed. Start fan,monitor indoor and outdoor conditions, and manually operate heating <br /> and cooling systems to control space conditions;shut down systems completely and close outdoor air dampers <br /> at end of each work day. <br /> 3.09 DEMONSTRATION <br /> A. Demonstration Services: Arrange and pay for a factory-authorized service representative to train Owner's <br /> maintenance personnel on the following: <br /> 1. Procedures and schedules related to start-up and shut down, troubleshooting, servicing, preventative <br /> maintenance,and how to obtain replacement parts. <br /> 2. Familiarization with contents of Operating and Maintenance Manuals specified in Division 1 Section"Project <br /> Closeout"and Division 15 Section 15010 Basic Mechanical Requirements. <br /> B. Schedule training with at least 7 days'advance notice. <br /> END OF SECTION 15854 <br /> 15854-13 No.99132-CP2 <br />