My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Connect condensate drain pans using 1-1/4-inch,Type M copper tubing. Extend to the nearest equipment or <br /> floor drain. Construct deep trap at connection to drain pan and install cleanouts at changes in direction. <br /> B. Duct installations and connections are specified in Section 15891 "Ductwork" and 15910 "Ductwork Accessories". <br /> Make final duct connections with flexible connections. <br /> C. Electrical Connections: The following requirements apply: <br /> 1. Electrical power wiring is specified in Division 16. <br /> 2. Temperature control wiring and interlock wiring is specified in Section 15970 "Energy Systems Management <br /> and Control Systems". <br /> 3. Grounding: Connect unit components to ground in accordance with the National Electrical Code. <br /> 3.05 FIELD QUALITY CONTROL <br /> A. Manufacturer's Field Inspection: Arrange and pay for a factory-authorized service representative to perform the <br /> following: <br /> 1. Inspect the field assembly of components and installation of central-station air-handling units including piping, <br /> ductwork,and electrical connections. <br /> 2. Prepare a written report on findings and recommended corrective actions. <br /> 3.06 ADJUSTING,CLEANING,AND PROTECTING <br /> A. Adjust water coil flow,with control valves to full coil flow,to indicated gpm. <br /> B. Adjust damper linkages for proper damper operation. <br /> C. Clean unit cabinet interiors to remove foreign material and construction dirt and dust. Vacuum clean fan wheel,fan <br /> cabinet,and coils entering air face. <br /> 3.07 COMIVUSSIONING - <br /> A. Final Checks Before Start Up: Perform the following operations and checks before start-up: <br /> 1. Remove shipping,blocking,and bracing. 1 <br /> 2. Verify unit is secure on mountings and supporting devices and that connections for piping, ductwork, and <br /> electrical are complete. Verify proper thermal overload protection is installed in motors, starters, and <br /> disconnects. <br /> 3. Perform cleaning and adjusting specified in this Section. <br /> 4. Disconnect fan drive from motor and verify proper motor rotation direction and verify fan wheel free rotation <br /> and smooth bearings operations. Reconnect fan drive system,align belts,and install belt guards. <br /> 5. Lubricate bearings,pulleys,belts,and other moving parts with factory-recommended lubricants. <br /> 6. Set outside-air and return-air mixing dampers to minimum outside-air setting. <br /> 7. Comb coil fins for parallel orientation. <br /> 15854-12 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.