My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> 01700- CONTRACT CLOSEOUT <br /> 1. Upon completion of the Work, submit record Specifications to the <br /> Construction Manager for the Owner's records. <br /> D. Miscellaneous Record Submittals: Refer to other Specification Sections for <br /> requirements of miscellaneous record-keeping and submittals in connection <br /> with actual performance of the Work. Immediately prior to the date or dates <br /> of Substantial Completion, complete miscellaneous records and place in good <br /> order, properly identified and bound or filed, ready for continued use and <br /> reference. Submit to the Construction Manager for the Owner's records. <br /> 6. FINAL CLEANING <br /> A. General: General cleaning during construction is required by the General <br /> Conditions and included in Section "Temporary Facilities." <br /> B. Removal of Protection: Remove temporary protection and facilities installed <br /> for protection of the Work during construction. <br /> C. Silt Fence: At completion of this contract work, the Contractor shall leave in <br /> place the silt fence for subsequent phases of work. The subsequent <br /> maintenance and removal of the silt fence will be by others. <br /> D. Compliance: Comply with regulations of authorities having jurisdiction and <br /> safety standards for cleaning. Do not burn waste materials. Do not bury <br /> debris or excess materials on the Owner's property. Do not discharge volatile, <br /> harmful or dangerous materials into drainage systems. Remove waste <br /> materials from the site and dispose of in a lawful manner. <br /> ' END OF SECTION 01700 <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01700-5 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.