My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> GENERAL REQUIREMENTS ' <br /> 01700- CONTRACT CLOSEOUT <br /> 1 <br /> 11. Special tools required for Owner maintenance. ' <br /> B. Submit four copies each of Items#1 through#5 above, and two copies each of <br /> Items#6 and#7 above. t <br /> 5. RECORD DOCUMENT SUBMITTALS <br /> A. General: Do not use record documents for construction purposes; protect <br /> from deterioration and loss in a secure, fire-resistive location; provide access <br /> to record documents for the Architect's reference during normal working ' <br /> hours. <br /> B. Record Drawings: Maintain a clean, undamaged set of blue or black line ' <br /> white-prints of Contract Drawings and Shop Drawings. Mark the set to show <br /> the actual installation where the installation varies substantially from the Work <br /> as originally shown. Mark whichever drawing is most capable of showing <br /> conditions fully and accurately; where Shop Drawings are used, record a <br /> cross-reference at the corresponding location on the Contract Drawings. Give <br /> particular attention to concealed elements that would be difficult to measure ' <br /> and record at a later date. <br /> 1. Mark record sets with red erasable pencil; use other colors to distinguish <br /> between variations in separate categories of the Work. <br /> 2. Mark new information that is important to the Owner, but was not shown ' <br /> on Contract Drawings or Shop Drawings. <br /> 3. Note related Change Order numbers where applicable. ' <br /> 4. Organize record drawing sheets into manageable sets, bind with durable <br /> paper cover sheets, and print suitable titles, dates and other identification ' <br /> on the cover.of each set.. <br /> C. Record Specifications: Maintain one complete copy of the Project Manual, ' <br /> including addenda, and one copy of other written construction documents such <br /> as Change Orders and modifications issued in printed form during <br /> construction. Mark these documents to show substantial variations in actual <br /> Work performed in comparison with the test of the Specifications and <br /> modifications. Give particular attention to substitutions, selection of options <br /> and similar information on elements that are concealed or cannot otherwise be 1 <br /> readily discerned later by direct observations. Note related record drawing <br /> information and Product Data. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01700-4 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL t <br />
The URL can be used to link to this page
Your browser does not support the video tag.