My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> 01700- CONTRACT CLOSEOUT <br /> 1. The Architect will repeat inspection when requested and assured that the ' <br /> Work has been substantially completed. <br /> 2. Results of the completed inspection will form the basis of requirements for <br /> final acceptance. <br /> 3. FINAL ACCEPTANCE , <br /> A. Preliminary Procedures: Before requesting final inspection for certification of <br /> final acceptance and final payment, complete the following. List exceptions in , <br /> the request. <br /> 1. Submit the final payment request with releases and supporting ' <br /> documentation not previously submitted and accepted. Include certificates <br /> of insurance for products and completed operations where required. <br /> Conform to the requirements of Section 01025 -Application for Payment. ' <br /> 2. Submit an updated final statement, accounting for final additional changes <br /> to the Contract Sum. ' <br /> 3. Submit a certified copy of the Architect's final inspection list of items to <br /> be completed or corrected, stating that each item has been completed or ' <br /> otherwise resolved for acceptance, and the list has been endorsed and <br /> dated by the Architect. <br /> 4. Submit final meter readings for utilities, a measured record of stored fuel, ' <br /> and similar data as of the date of Substantial Completion, or when the <br /> Owner took possession of and responsibility for corresponding elements of ' <br /> the Work. <br /> 5. Submit consent of surety to final payment. <br /> 6. Submit evidence of final, continuing insurance coverage complying with <br /> insurance requirements. ' <br /> B. Reinspection Procedure: The Construction Manager will reinspect the Work <br /> upon receipt of notice that the Work, including inspection list items from ' <br /> earlier inspections, has been completed, except items whose completion has <br /> been delayed because of circumstances acceptable to the Architect. <br /> 1. Upon completion of reinspection, the Architect will prepare a certificate of <br /> P P P� P P <br /> final acceptance, or advise the Contractor of Work that is incomplete or of <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01700-2 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.