My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> 01700- CONTRACT CLOSEOUT <br /> 1 <br /> 1. GENERAL <br /> A. This Section specifies administrative and procedural requirements for project <br /> closeout, including but not limited to: <br /> 1. Inspection procedures. <br /> 2. Project record document submittal. <br /> ' 3. Operating and maintenance manual submittal. <br /> 4. Submittal of warranties. <br /> 5. Final cleaning. <br /> ' B. Closeout requirements for specific construction activities are included in the <br /> appropriate Sections in Divisions 2 through 16. <br /> 2. SUBSTANTIAL COMPLETION <br /> A. Preliminary Procedures: Before requesting inspection for certification of <br /> Substantial Completion, complete the following: List exceptions in the <br /> request. <br /> 1. In the Application for Payment that coincides with, or first follows, the <br /> date Substantial Completion is claimed, show 100 percent completion for <br /> the portion of the Work claimed as substantially complete. Include <br /> supporting documentation for completion as indicated in these Contract <br /> Documents and a statement showing an accounting of changes to the <br /> Contract Sum. <br /> a. If 100 percent completion cannot be shown, include a list of <br /> ' incomplete items, the value of incomplete construction, and reasons <br /> the Work is not complete. <br /> ' 2. Advise Owner of pending insurance change-over requirements. <br /> 3. Submit specific warranties, workmanship bonds, maintenance agreements, <br /> final certifications and similar documents. <br /> 4. Remove temporary facilities from the site, along with construction tools, <br /> ' mock-ups, and similar elements. <br /> B. Inspection Procedures: On receipt of a request for inspection, the Architect <br /> will either proceed with inspection or advise the Contractor of unfilled <br /> requirements. The Architect will prepare the Certificate of Substantial <br /> Completion following inspection, or advise the Contractor of construction that <br /> 1 must be completed or corrected before the certificate will be issued. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01700- 1 <br /> ' BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />