My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Step Two-Product Acceptance <br /> 1. Upon award of a construction contract,accepted manufacturers may submit for review to the Architect through <br /> the General Contractor, specific products, materials or equipment items as substitutes for those specified. t <br /> General contractor to provide letter stating they will reimburse Architect to review substitutions. <br /> 2. Architect will review substitute products for performance, appearance, color, finish, size and suitability for <br /> inclusion in the work. If a substitute product is not accepted, submit another product by the same or other , <br /> accepted manufacturer or provide the specified product. <br /> 3. Match specified colors and dimensions exactly, whether or not they are standard with the substitute product, <br /> unless a minor variation is accepted by the Architect. <br /> 4. If a substitute product is accepted, coordinate any necessary changes in other related work and pay for these <br /> changes. Pay cost of architectural or engineering services, if any,required to incorporate substitute products ' <br /> in the Work. <br /> 1.04 SUBSTITUTIONS BY CHANGE ORDER ' <br /> A. A substitution for a specified product may be permitted by "change order" at no additional cost to the Owner if <br /> product proposed is determined to be equivalent in performance and suitability, and if at least one of the following ' <br /> conditions apply: <br /> 1. Owner is given a credit for the work. <br /> 2. Product is of superior quality than product specified. ' <br /> 3. Product color or finish selection is preferable. ' <br /> 4. Products specified and upon which building is designed have been discontinued by manufacturer. <br /> B. Provide Architect,through Owner,reasonable compensation for product evaluation. ' <br /> END OF SECTION 01630 , <br /> 1 <br /> 01630-2 No.99132-CP2 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.