Laserfiche WebLink
B. Step Two-Product Acceptance <br /> 1. Upon award of a construction contract,accepted manufacturers may submit for review to the Architect through <br /> the General Contractor, specific products, materials or equipment items as substitutes for those specified. t <br /> General contractor to provide letter stating they will reimburse Architect to review substitutions. <br /> 2. Architect will review substitute products for performance, appearance, color, finish, size and suitability for <br /> inclusion in the work. If a substitute product is not accepted, submit another product by the same or other , <br /> accepted manufacturer or provide the specified product. <br /> 3. Match specified colors and dimensions exactly, whether or not they are standard with the substitute product, <br /> unless a minor variation is accepted by the Architect. <br /> 4. If a substitute product is accepted, coordinate any necessary changes in other related work and pay for these <br /> changes. Pay cost of architectural or engineering services, if any,required to incorporate substitute products ' <br /> in the Work. <br /> 1.04 SUBSTITUTIONS BY CHANGE ORDER ' <br /> A. A substitution for a specified product may be permitted by "change order" at no additional cost to the Owner if <br /> product proposed is determined to be equivalent in performance and suitability, and if at least one of the following ' <br /> conditions apply: <br /> 1. Owner is given a credit for the work. <br /> 2. Product is of superior quality than product specified. ' <br /> 3. Product color or finish selection is preferable. ' <br /> 4. Products specified and upon which building is designed have been discontinued by manufacturer. <br /> B. Provide Architect,through Owner,reasonable compensation for product evaluation. ' <br /> END OF SECTION 01630 , <br /> 1 <br /> 01630-2 No.99132-CP2 ' <br />