My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01630 <br /> SUBSTITUTIONS AND PRODUCT OPTIONS <br /> ' PART 1: GENERAL <br /> 1.01 DESCRIPTION <br /> A. This Section defines procedures to be followed to gain acceptance of products in the Work which are not listed in <br /> ' the individual specification sections. A two step process is required. <br /> B. Requests for acceptance for bidding purposes of alternative manufacturers is encouraged except where specifically <br /> prohibited by this Project Manual. <br /> 1.02 PRODUCT OPTIONS NOT REQUIRING PRE-BID SUBMITTAL <br /> ' A. Where products are specified by reference standards, any product established by a material testing agency to meet <br /> these standards is acceptable. <br /> B. Where multiple manufacturers and associated models are specified,select any one named. <br /> C. Where manufacturer(s)alone are specified,select any manufacturer and the product recommended in writing by the <br /> manufacturer as most suited to the application shown on the Drawings and Specifications. <br /> ' D. Where the phrase "or equal' follows the name of a manufacturer, any product which meets the performance and <br /> appearance standards established by the specified manufacturer may be selected, subject to the Architect's <br /> acceptance. <br /> 1.03 PRODUCT SUBSTITUTIONS REQUIRING PRE-BID SUBMITTALS <br /> A. Step One-Manufacturers Acceptance <br /> 1. Individual specification sections may be amended by the Architect during the bid period to include additional <br /> ' names of manufacturers determined to be capable of providing acceptable materials. <br /> 2. To propose the names of specific manufacturers,submit,or arrange for suppliers to submit,written requests to <br /> Architect or appropriate Architect's Consultant. Requests received ten(10)calendar days prior to bid date will <br /> ' be considered. <br /> a. Provide sufficient review data. Include specified manufacturer's model numbers and proposed <br /> ' manufacturer's product literature, noting product numbers for proposed substitutions, and where <br /> appropriate,samples and data relating to construction details. If the product is not identical to specified <br /> product, submit<letter stating proposed.,manufacturer will custom make products to meet specified <br /> product. <br /> b. Architect's acceptance is based upon his determination that a manufacturer is capable of supplying <br /> acceptable materials. Approval is not assured or implied for a specific material,item of equipment,color <br /> ' or finish. <br /> C. Official notification will be by addendum to the Contract Documents. However,in addition, if letters of <br /> request are delivered in duplicate with accompanying stamped self addressed envelopes, copies may be <br /> ' returned with Architect's decision in advance. <br /> 1 <br /> ' 01630-1 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.