My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> ' GENERAL REQUIREMENTS <br /> 01500-TEMPORARY FACILITIES <br /> ' 6) Remove all temporary heating devices when permanent heating systems <br /> are activated. <br /> ' 7) Only where the building, or portion of the building, is substantially <br /> completed, and accepted as completed, including total enclosure with <br /> ' walls, windows, doors and roofing, will the existing or newly installed, <br /> permanent heating system, be allowed to be used for construction <br /> purposes, the Contractor shall: <br /> a. Notify the Owner in writing, one week prior to switch over. <br /> ' b. Contractor shall have existing utility meters, gas, electric and water <br /> read. Document in writing to Owner all readings. <br /> c. Contractor shall direct utility companies to temporarily assign, for the <br /> duration of construction, all billing directly to the Contractor for <br /> payment. <br /> d. Keep equipment and surrounding areas in a clean and safe condition. <br /> e. Contractor shall recondition units, including changing filters, <br /> lubrication, etc. <br /> ' f. Warranties will be maintained. Any warranty or guarantee period on <br /> any permanent items used during temporary heating periods shall <br /> commence on date of final acceptance of building by Owner. <br /> ' E. Temporary Telephone Service: <br /> ' 1) Each Contractor shall provide temporary telephone and fax service as <br /> needed for all personnel engaged in construction activities, throughout the <br /> construction period. Contractor shall pay for all local telephone service. <br /> ' Long distance calls shall be paid for by person or company placing the <br /> call. <br /> 2) Contractor is not to use, or tap into any of the Owner's existing telephone <br /> service. <br /> ' 3) Remove all temporary telephone service, including wiring and <br /> connections, at the completion of the Contract. Wiring shall not be cut <br /> and left above ceiling lines. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01500- 5 <br /> ' BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.