Laserfiche WebLink
DIVISION 1 <br /> ' GENERAL REQUIREMENTS <br /> 01500-TEMPORARY FACILITIES <br /> ' 6) Remove all temporary heating devices when permanent heating systems <br /> are activated. <br /> ' 7) Only where the building, or portion of the building, is substantially <br /> completed, and accepted as completed, including total enclosure with <br /> ' walls, windows, doors and roofing, will the existing or newly installed, <br /> permanent heating system, be allowed to be used for construction <br /> purposes, the Contractor shall: <br /> a. Notify the Owner in writing, one week prior to switch over. <br /> ' b. Contractor shall have existing utility meters, gas, electric and water <br /> read. Document in writing to Owner all readings. <br /> c. Contractor shall direct utility companies to temporarily assign, for the <br /> duration of construction, all billing directly to the Contractor for <br /> payment. <br /> d. Keep equipment and surrounding areas in a clean and safe condition. <br /> e. Contractor shall recondition units, including changing filters, <br /> lubrication, etc. <br /> ' f. Warranties will be maintained. Any warranty or guarantee period on <br /> any permanent items used during temporary heating periods shall <br /> commence on date of final acceptance of building by Owner. <br /> ' E. Temporary Telephone Service: <br /> ' 1) Each Contractor shall provide temporary telephone and fax service as <br /> needed for all personnel engaged in construction activities, throughout the <br /> construction period. Contractor shall pay for all local telephone service. <br /> ' Long distance calls shall be paid for by person or company placing the <br /> call. <br /> 2) Contractor is not to use, or tap into any of the Owner's existing telephone <br /> service. <br /> ' 3) Remove all temporary telephone service, including wiring and <br /> connections, at the completion of the Contract. Wiring shall not be cut <br /> and left above ceiling lines. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01500- 5 <br /> ' BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />