My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> ' CONDITIONS OF THE CONTRACT <br /> 01400- QUALITY CONTROL- <br /> TESTING SERVICES <br /> B. Inspection of Work by Others: Each Contractor shall inspect Work of others <br /> ' which will receive or is adjacent to his Work before commencing his Work. <br /> Do not proceed until conditions which would result in a less than first class <br /> installation are satisfactorily corrected. Commencing Work shall be construed <br /> ' as acceptance of the Work of others, by the Contractor, as satisfactory to <br /> receive his Work. The Contractor shall bear all costs to correct the <br /> unsatisfactory Work. <br /> 8. COOPERATION WITH TESTING LABORATORY <br /> A. Representatives of the testing laboratory shall have access to the Work at all <br /> times. Provide facilities for such access in order that the laboratory may <br /> properly perform its function. <br /> B. Specimens and samples for testing, unless otherwise provided in the Contract <br /> Documents, will be taken by the testing personnel. Sampling equipment and <br /> ' personnel will be provided by the testing laboratory. Deliveries of specimens <br /> and samples to the testing laboratory will be performed by the testing <br /> laboratory. <br /> C. Test results and reports shall be furnished simultaneously to the Engineer (2 <br /> copies) and the Construction Manager(1 copy) within one week of testing. <br /> 9. TESTING SCHEDULE <br /> ' A. The Owner shall pre-qualify and identify qualified independent inspection <br /> agencies in a timely manner, allowing Engineer adequate time for review and <br /> approval. <br /> B. Special Structural Testing Schedule to be implemented per specifications. <br /> C. When changes of construction schedule are necessary during construction, the <br /> Construction Manager shall coordinate such changes of.schedule with the <br /> testing laboratory as required. <br /> 1 D. When the testing laboratory is ready to test according to the established <br /> schedule, but is prevented from testing or taking specimens due to <br /> ' incompleteness of the Work, all extra charges for testing attributable to the <br /> delay may be backcharged to the Contractor and shall not be borne by the <br /> Owner. <br /> END OF SECTION 01400 <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01400- 3 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.