My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> CONDITIONS OF THE CONTRACT ' <br /> 01400- QUALITY CONTROL - <br /> TESTING SERVICES <br /> B. Promptly respond to test reports and related instructions to ensure necessary ' <br /> retesting and replacement of materials with the least possible delay in progress <br /> of the Work. <br /> 4. FIELD CONDITIONS r <br /> A. The Contractor shall take field measurements and verify field conditions and <br /> shall carefully compare such field measurements and conditions with the <br /> Contract Documents and any shop drawings and product data before <br /> commencing any related work. Errors, inconsistencies or omissions shall be <br /> reported to the Construction Manager and the Architect at once. <br /> 5. PAYMENT FOR TESTING <br /> A. Initial Services: The Owner's Testing Laboratory shall be responsible for <br /> initial testing services as outlined in various sections and Section 7.7 of the <br /> General Conditions. <br /> B. Re-Testing Services: When initial tests indicate non-compliance with the <br /> Contract Documents, all subsequent retesting occasioned by the non- <br /> compliance shall be performed by the same testing agency and the costs <br /> thereof will be borne by the Contractor responsible for the work that is non- <br /> compliant. <br /> 6. TESTING <br /> A. Code Compliance Testing: Inspections and tests required by codes or <br /> ordinances, or by a plan approval authority, and which are made by a legally <br /> constituted authority, shall be the responsibility of and shall be paid for by the <br /> Contractor,unless otherwise provided in the Contract Documents. <br /> B. Contractor's Convenience Testing: Inspecting and testing performed <br /> exclusively for the Contractor's convenience shall be the sole responsibility of <br /> the Contractor. <br /> 7. INSPECTION <br /> A. Inspection by Owner's Personnel: From time to time, personnel in the employ ' <br /> of the Owner may inspect the Work where the Work is in progress, but shall <br /> have no authority to direct the Contractor or request changes in the Work <br /> except through the Construction Manager and the Architect. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01400- 2 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.