Laserfiche WebLink
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> 01500-TEMPORARY FACILITIES <br /> ' 1. GENERAL <br /> A. Drawings and general provisions of Contract, including General and <br /> Supplementary Conditions and Division 1 Specification Sections, apply to this <br /> Section. <br /> ' B. No separate payment will be made for any work under this Section. <br /> 1 C. Work required by this Section includes but is not limited to the following: <br /> 1) Temporary utilities: <br /> a. Water service and distribution. <br /> b. Temporary electric power and light. <br /> c. Temporary heat. <br /> d. Telephone service. <br /> 2) Temporary construction and support facilities: <br /> a. Field offices and storage sheds. <br /> b. Sanitary facilities. <br /> c. Dewatering facilities and drains. <br /> d. Temporary structure enclosures. <br /> ' e. Temporary signs. <br /> f. Waste disposal services. <br /> g. Rodent and pest control. <br /> h. Construction aids and miscellaneous services and facilities. <br /> 3) Temporary security and protection facilities: <br /> ' a. Temporary fire protection. <br /> b. Site enclosures,barricades, warning signs, lights. <br /> c. Environmental protection. <br /> 4) Dumpsters: The Owner will pay for and the Construction Manager will <br /> ' provide and coordinate metal containers (dumpsters) for collection of <br /> debris. <br /> a. Contractor shall not abuse use of dumpsters. <br /> b. Contractor shall not cross-contaminate any designated containers. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01500- 1 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />