My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> 1 CONDITIONS OF THE CONTRACT <br /> 01400- QUALITY CONTROL- <br /> TESTING SERVICES <br /> 1. GENERAL <br /> ' A. Drawings and general provisions of Contract, including General and <br /> Supplementary Conditions and Division 1 Specification Sections apply to this <br /> ' Section. <br /> B. This section specifies the general requirements for testing and inspection <br /> services. <br /> C. Cooperate with Owner's testing laboratory and all others responsible for <br /> testing and inspecting the Work. <br /> D. Provide other testing and inspecting as specified to be furnished by the <br /> Contractor in this Section and/or elsewhere in these Specifications. <br /> E. Provide quality control by the observation and acceptance of work by others <br /> being built upon. <br /> F. Related work described elsewhere: <br /> 1. Requirements for testing are described in Divisions 2, 3, 4 and 5 product <br /> sections of these Specifications. <br /> i2. Where no testing requirements are described, but the Construction <br /> Manager decides that testing is required, he may direct that such testing be <br /> performed under current standards for testing and Section 7.7 of the <br /> General Conditions. <br /> G. Selection of testing laboratory: The Owner shall hire and pay for an <br /> independent testing laboratory. <br /> 2. CODES AND STANDARDS <br /> A. Testing, when required, will be in accordance with pertinent codes and <br /> regulations and with selected standards of the American Society for Testing <br /> and Materials. <br /> 3. REVIEW OF THE CONTRACT DOCUMENTS <br /> A. On all Project Drawings, figures take precedence over measurement by scale, <br /> ' and any scaling is done at the Contractor's own risk. Before ordering any <br /> materials or performing any Work, the Contractor shall verify all <br /> measurements at the project site and be responsible for the correctness of <br /> ' same. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01400- 1 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.