My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> ' CONDITIONS OF THE CONTRACT <br /> 01300-SUBMITTALS <br /> 8. INSTRUCTION MANUALS <br /> A. For all items of mechanical equipment and electrical apparatus, the Contractor <br /> shall obtain from the manufacturer and furnish to the Architect three (3) <br /> copies of the following: <br /> 1. Operating instructions. <br /> 2. Parts lists (including name and address of nearest vendor or service agent). <br /> 3. Maintenance instructions. <br /> 4. Shop Drawings. <br /> B. These items are separate from and in addition to the operating placards <br /> required to be attached to or posted near the equipment. <br /> C. Contractor shall provide field instruction to Owner's personnel as required to <br /> fully instruct them in correct operating and maintenance procedure, for all <br /> equipment installed under this contract. <br /> D. Manual shall be submitted in 8-1/2" x 11" form in adequately sized three (3) <br /> ring loose leaf binders with entire contents indexed and thumb-tabbed. <br /> 9. RECORD SET OF DRAWINGS <br /> A. Contractor shall provide the record set of drawings to the Construction <br /> Manager at the completion of Contract. <br /> B. During construction, Contractor shall maintain a clean set of drawings for the <br /> sole purpose of recording changes and actual "as installed" information. <br /> ' C. As a general guide, the type of information to be recorded on the record set <br /> includes: (1) changes, deviations or revisions made, except minor or <br /> noncritical dimensions, including those made by Change Order or <br /> 1 Supplementary Instructions; (2) omissions, including work omitted by <br /> accepted alternates, (3}dimensioned..locations of major or main utility lines, <br /> such as main conduit runs, piping mains and similar work; (4) locations of <br /> control valves; (5) additions to the work; (6) changes in significant details; <br /> (7) changed footing or other elevations; (8) changes in locations of <br /> panelboards, outlets, drains, piping, opening, dampers and similar features; <br /> (9) other similar data. <br /> END OF SECTION 01300 <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01300 - 5 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.