Laserfiche WebLink
DIVISION 1 <br /> CONDITIONS OF THE CONTRACT <br /> 01300 -SUBMITTALS <br /> subcontractors. No subcontracts shall be executed until the proposed list of <br /> subcontractors is accepted. <br /> C. Reasonable objection shall be deemed to have been exercised when, in the <br /> opinion of the Architect or Owner, objections have been made based on their <br /> reasonable belief that the proposed Subcontractor, Sub-subcontractor or <br /> material supplier: (1) cannot provide materials, equipment, facilities or other <br /> products as specified or requited by the Contract Documents; (2) cannot <br /> provide labor and skill necessary to accomplish the part of Work for which he <br /> is proposed, including but not limited to quality of workmanship; (3) lacks <br /> adequate and appropriate experience for the part of the Work for which he is <br /> proposed, including materials or methods required; (4)has previously failed to <br /> perform timely or satisfactorily, including in cooperation and in necessary <br /> services after project completion; (5) proposed deviations in material or <br /> methods that are unacceptable to the Architect or Owner, such as proposing <br /> materials or methods that were not specified or not listed in addenda; (6) there <br /> is reasonable doubt he can satisfactorily perform the part of the Work for <br /> which he is proposed, within the time schedule, due to size of organization or <br /> existing work load; 7) cannot demonstrate his ability through quality or <br /> representative work to perform the part of the Work for which he is being <br /> considered; (8) of questionable integrity; (9) or other similar considerations <br /> bearing on the possibility of unsatisfactory performance. If the Owner, <br /> Construction Manager or the Architect has a reasonable objection to any <br /> person or entity proposed by a substitute to whom neither the Owner, <br /> Construction Manager, nor the Architect has any reasonable objection and no <br /> increase in the Contract Sum shall be allowed as a result of any such <br /> substitution. <br /> D. After review of the proposed list, no change of any Subcontractor, Sub- <br /> subcontractor or supplier not objected to by the Architect, Construction <br /> Manager or Owner, shall be made, except for cause acceptable to all parties. <br /> In the event of a proposed change, the Contractor shall submit the reasons for <br /> the change, in writing, along with the alternate proposed Subcontractor, Sub- <br /> subcontractor or material supplier. The proposed change is subject to the <br /> conditions of this Article and the requirements of the General Conditions. <br /> 7. GUARANTEES AND WARRANTIES <br /> A. Refer to Section 00700 - General Conditions, Article 3.5 and 9.3.3 and <br /> Section 00800- Supplemental Conditions. <br /> B. Special Warranties: Contractor shall complete all manufacturer's warranty <br /> registrations and shall submit same to Construction Manager for transmittal to <br /> Owner. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01300-4 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />