My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> CONDITIONS OF THE CONTRACT <br /> 01300 -SUBMITTALS <br /> subcontractors. No subcontracts shall be executed until the proposed list of <br /> subcontractors is accepted. <br /> C. Reasonable objection shall be deemed to have been exercised when, in the <br /> opinion of the Architect or Owner, objections have been made based on their <br /> reasonable belief that the proposed Subcontractor, Sub-subcontractor or <br /> material supplier: (1) cannot provide materials, equipment, facilities or other <br /> products as specified or requited by the Contract Documents; (2) cannot <br /> provide labor and skill necessary to accomplish the part of Work for which he <br /> is proposed, including but not limited to quality of workmanship; (3) lacks <br /> adequate and appropriate experience for the part of the Work for which he is <br /> proposed, including materials or methods required; (4)has previously failed to <br /> perform timely or satisfactorily, including in cooperation and in necessary <br /> services after project completion; (5) proposed deviations in material or <br /> methods that are unacceptable to the Architect or Owner, such as proposing <br /> materials or methods that were not specified or not listed in addenda; (6) there <br /> is reasonable doubt he can satisfactorily perform the part of the Work for <br /> which he is proposed, within the time schedule, due to size of organization or <br /> existing work load; 7) cannot demonstrate his ability through quality or <br /> representative work to perform the part of the Work for which he is being <br /> considered; (8) of questionable integrity; (9) or other similar considerations <br /> bearing on the possibility of unsatisfactory performance. If the Owner, <br /> Construction Manager or the Architect has a reasonable objection to any <br /> person or entity proposed by a substitute to whom neither the Owner, <br /> Construction Manager, nor the Architect has any reasonable objection and no <br /> increase in the Contract Sum shall be allowed as a result of any such <br /> substitution. <br /> D. After review of the proposed list, no change of any Subcontractor, Sub- <br /> subcontractor or supplier not objected to by the Architect, Construction <br /> Manager or Owner, shall be made, except for cause acceptable to all parties. <br /> In the event of a proposed change, the Contractor shall submit the reasons for <br /> the change, in writing, along with the alternate proposed Subcontractor, Sub- <br /> subcontractor or material supplier. The proposed change is subject to the <br /> conditions of this Article and the requirements of the General Conditions. <br /> 7. GUARANTEES AND WARRANTIES <br /> A. Refer to Section 00700 - General Conditions, Article 3.5 and 9.3.3 and <br /> Section 00800- Supplemental Conditions. <br /> B. Special Warranties: Contractor shall complete all manufacturer's warranty <br /> registrations and shall submit same to Construction Manager for transmittal to <br /> Owner. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01300-4 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.