My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> 01041 -SCHEDULES <br /> at no additional cost to the Owner, except in accordance with the provision of <br /> the contract governing such costs. If the Owner notified the Contractor any <br /> change in the contract or any extra work performed, or if any other conditions <br /> arise which are likely to cause or are actually caused delays, the Contractor <br /> shall notify the Construction Manager in writing within five (5) days of the <br /> receipt of such notice or occurrence of such condition. This notice shall <br /> document the effect, if any, of such change, or extra work, of suspension or <br /> other condition upon the Construction Schedule. No time extensions will be <br /> granted due to a delay in any activity unless the Owner deems the length of <br /> the delay exceeds the float time associated with the activity at the time the <br /> delay occurs. <br /> B. Refer to General Conditions Paragraph 8.3.3 for actual damages clause. <br /> g <br /> 6. FLOAT TIME <br /> A. The Contractor, in directing the compliance with Construction Schedule shall <br /> cooperate with the Owner and the Construction Manager in utilizing float <br /> time. Full control over use of total float time in the Schedule rests with the <br /> Owner and will be utilized by him in any necessary rescheduling of the <br /> Construction Schedule occasioned by design changes,field conditions, strikes, <br /> Acts of God, or unavoidable equipment and material delays. If rescheduling <br /> of any activity adversely affects the Contractor's operation, he shall advise the <br /> Construction Manager in writing no later than five (5) days after the receipt of <br /> the revised schedule or Notice of Intent to revise the schedule. <br /> 7. PRELIMINARY SCHEDULE <br /> Substantial Completion-August 11, 2000 <br /> Final Completion-August 18, 2000 <br /> END OF SECTION 01041 <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01041 -3 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />