Laserfiche WebLink
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> 01045 - CUTTING AND PATCHING <br /> 1. WORK INCLUDED <br /> A. Refer to Section 01010 and 01500 for special requirements, protection, <br /> constraints, timing of work, scheduling of work, enclosures and similar <br /> requirements relating to this Section. <br /> B. This Section covers cutting, demolition, removal work, patching and <br /> restoration of work as necessary to accomplish and complete all work under <br /> the Contract, including any relocation or reuse of existing materials, <br /> equipment, systems, or other work, as well as the disposition of salvaged <br /> materials or debris. This Section applies to all work under the Contract, <br /> including general construction, mechanical and electrical work. <br /> C. Drawings generally indicate the extent of demolition, removals, relocations <br /> and cutting. The drawings shall not be construed as indicating all required <br /> work, nor indicating all conditions or details which might be encountered to <br /> accomplish the work of this Contract. The Contractor and his subcontractors <br /> shall examine the spaces themselves to determine the actual conditions and <br /> requirements. All removals, demolition, cutting, restoration, new installations <br /> and other work shall be accomplished to transform the existing spaces and <br /> conditions to the new conditions required under the Contract, as well as to <br /> accomplish all tie-in work of new to existing. <br /> D. It is the intent that unless specially shown on the general construction type <br /> drawings (i.e.; architectural and structural) and schedules, or in inherent in the <br /> work to be accomplished under the general construction work of the area, that <br /> the mechanical and electrical Contractors shall perform the demolition, <br /> cutting, removals, relocations, patching and restoration as will be required to <br /> accomplish the work under their contracts. All work shown or indicated on <br /> the general construction drawings and schedules shall be accomplished by the <br /> General Contractor. <br /> E. Except for general demolition of entire areas, it is the intent that at each area, <br /> or.space, the Contractor and each subcontractor shall make the removals, <br /> perform cutting or demolition and accomplish relocations of work normal to <br /> his trades (i.e., Mechanical Contractor removes or relocates piping, ductwork <br /> and similar; Electrical Contractor removes or relocates panelboards, conduit <br /> lighting and similar). At areas of general demolition of the entire spaces, the <br /> Mechanical and Electrical shall make removals of work normal to their trades <br /> or as may be called for, for reuse or relocation, make any relocations and cut- <br /> off, terminate, cap or otherwise discontinue services that will be abandoned or <br /> removed in the space. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01045 - 1 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />