My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> CONDITIONS OF THE CONTRACT <br /> 00800-SUPPLEMENTARY <br /> CONDITIONS <br /> 15. ARTICLE 15 -ADDITIONAL CONDITIONS <br /> 15.1 Additional Definitions <br /> 15.1.1 Provide: As used in connection with labor, materials and equipment shall mean <br /> to furnish and install complete, including connections to utilities or service, <br /> complete anchorage and suspension, fastening or anchor devices, trim, finish <br /> and other related work,unless specified otherwise. <br /> 15.1.2 Accepted, approved, satisfactory, equal to, proper, as directed and similar terms: <br /> These shall mean the decision rests with the Architect, whose decision shall be <br /> final and binding upon the Contractor and Subcontractors. <br /> 15.1.3 Project, Work, Job: In the technical sections or on the drawings, these terms <br /> may be used interchangeably and are synonymous. They shall mean the facility, <br /> construction and/or improvement within the intent and scope of the Contract <br /> Documents. The terms shall mean the entire facility, or separable parts as <br /> appropriate to the use of the term, including that under subcontract where <br /> applicable, and includes labor, materials, equipment, services and skill. <br /> 15.1.4 Notice to Proceed: This shall be written notice by the Construction Manager to <br /> the Contractor to commence Work of the Contract, issued either before or after <br /> execution of the Contract. In issuing the Notice, stipulations may be included as <br /> to time and other requirements that may condition commencement of the Work. <br /> 15.2 Use of Drawings and Specifications <br /> 15.2.1 During construction, the Contractor shall examine and use all Specifications and <br /> Drawings for the Project, including those that may primarily pertain to other <br /> work the Contractor normally does not perform with his own forces. The <br /> Contractor shall use all of the Project Drawings and Specifications: for a <br /> complete. understanding,of the Project and the Work; to determine.the type, of <br /> construction and systems; for coordination; to determine what other work may <br /> be involved in various parts or phases; to anticipate and notify others when work <br /> will be required; and all other relevant matters related to the Project. The <br /> Contractor shall also be bound by all the requirements to complete his Work, <br /> that are applicable to, pertain to, or affect the Work, as may be shown or <br /> inferred by the entire set of Drawings and Specifications. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800-24 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.