My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> ' CONDITIONS OF THE CONTRACT <br /> 00800-SUPPLEMENTARY <br /> CONDITIONS <br /> I Take possession of the site and of all materials, equipment, tools, construction <br /> equipment and machinery thereon owned by the Contractor; may finish the <br /> Work by whatever method the Owner may deem expedient. <br /> i .2 Accept assignment of subcontracts pursuant to paragraph 5.4. <br /> 14.2.3 In the second line between the words "Contractor" and "shall" insert the words <br /> "or Contractor's Surety". <br /> 14.2.4 Change the wording to read: If the Owner completes the Work and the unpaid <br /> balance of the Contract Sum exceeds the costs of finishing the Work, including <br /> the Owner's additional costs, attorneys' costs and compensation for the <br /> Construction Manager's and Architect's additional services, such excess shall be <br /> paid to the Contractor. If such costs for the Owner to complete the work <br /> exceeds such unpaid balance, the Contractor and/or his Surety shall pay the <br /> ' difference to the Owner. The amount to be paid to the Contractor or to the <br /> Owner, as the case may be, shall be certified by the Owner or Contractor and <br /> reviewed by the Construction Manager, and approved by the Architect, and this <br /> obligation for payment shall survive the termination of the Contract. <br /> 14.4 Add Paragraph: Termination by Owner for Convenience <br /> 14.4.1 Add Subparagraph: The Owner may, at any time, terminate the Contract for the <br /> Owner's convenience and without cause. <br /> 14.4.2 Add Subparagraph: Upon receipt of written notice from the Owner of such <br /> termination for the Owner's convenience,the Contractor shall: <br /> 1 Cease operations as directed by the Owner in the notice; <br /> .2 Take actions necessary, or that the Owner may direct, for the protection and <br /> preservation.of the Work; and. <br /> .3 Except for Work directed to be performed prior to the effective date of <br /> termination stated in the notice,terminate all existing Subcontracts and purchase <br /> orders and enter into no further Subcontracts and purchase orders. <br /> 14.4.3 Add Subparagraph: In case of such termination for the Owner's convenience, <br /> the Contractor shall be entitled to receive payment from the Owner on the same <br /> basis provided in Subparagraph 14.1.2. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800-23 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.