My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> ' CONDITIONS OF THE CONTRACT <br /> 00800 -SUPPLEMENTARY <br /> CONDITIONS <br /> undermining or creating pressure on the construction; pumping of water from <br /> ' work areas and excavations of this Contract, and spaces built, constructed or <br /> opened up under the Contract, and if necessary, installing temporary heat to <br /> keep the spaces dry; providing protection and planking on finished floors and <br /> other finished surfaces where work is being done by the Contractor or <br /> subcontractors; closing and protecting all holes or openings through walls, <br /> floors and roofs that are cut or built by the Contractor or subcontractors; and <br /> which will admit water to interior spaces during the construction period or will <br /> create a potential safety hazard; removal of snow to accomplish the Work; <br /> keeping premises in neat and orderly condition; eliminating fire hazards. <br /> ' 10.4.5 As may be applicable to the Project and to his Work, the Contractor shall be <br /> responsible for the following; providing safe and adequate stairways (temporary <br /> ' and permanent) for the use of all trades; maintaining access to the site; proper <br /> protection by heating of an enclosed building during cold weather; protection for <br /> tress and other similar features, which are to remain, from damage from <br /> ' operations in connection with Project, by boxing tree trunks and setting up <br /> barricades at sufficient distance to prevent damage to branches; the removal of <br /> accumulated snow and ice within a building, which generally shall be hauled out <br /> ' (not melted), unless it is a minor amount, as approved by Architect/Construction <br /> Manager. <br /> 10.4.6 The Contractor and each subcontractor shall provide storage and enclosures to <br /> protect and preserve the materials stored at and off the site. Materials such as <br /> wood, metal, cement, masonry materials, equipment of any type, conduit and <br /> ' similar materials, shall not be set directly on ground. Coverings shall be <br /> durable, watertight, fully cover sides as well as top, substantial and well <br /> anchored to prevent blowing away. Shed type enclosures shall be provided for <br /> ' easily damaged and small items. Any protection which becomes damaged shall <br /> be replaced immediately. Contractor's storage shall be reviewed and accepted <br /> by the Construction Manager, as it relates to site coordination. <br /> ' 1.1... ARTICLE 11 -INSURANCE AND.BONDS. <br /> 1 11.1 Contractor's Liability Insurance <br /> 11.1.1 Delete subparagraph and insert instead: Contractor and Subcontractor shall <br /> ' purchase and maintain commercial general liability insurance as required to <br /> protect the Contractor, Subcontractor, Construction Manager, Architect and <br /> Owner from claims set forth below which may arise out of or result from <br /> ' operations of the contract under this contract, whether such claims arise during <br /> Contract/Subcontractor performance or subsequent to completion of operations <br /> ' under the Contract/Subcontract and whether such operations be by Contractor or <br /> EXISTING ORONO MIDDLE SCHOOL NEW MEDIA CENTER SECTION 00800 17 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION, MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.