My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 , <br /> CONDITIONS OF THE CONTRACT ' <br /> 00800 -SUPPLEMENTARY <br /> CONDITIONS <br /> Overhead/Profit Commission <br /> (a) To the Contractor and/or ' <br /> Subcontractor for work <br /> performed with their ' <br /> own forces 10% <br /> (b) To the Contractor for work , <br /> performed by other than <br /> its own forces -- 5% <br /> .3 Not more than two percentages for overhead, profit and commission will ' <br /> be allowed. The mark-up on any part of the Work a Subcontractor <br /> subcontracts will be limited to one overhead/profit figure. In addition to <br /> the Contractor's commission. The Subcontractor and Sub-subcontract may <br /> divide the overhead and profit amount as they agree upon. <br /> .4 The burden on labor may be indicated as a dollar/cents addition to the , <br /> hourly rate or may be expressed as a percentage of the extended hourly <br /> rate costs. If required by the Owner, Construction Manager or the <br /> Architect, the Contractor shall provide a detailed breakdown to justify the <br /> labor burden. The Construction Manager reserves the right to reject any <br /> labor burden which is inconsistent with other similar contractors or where ' <br /> the cost of fringe benefits are in excess of established labor agreements. <br /> The burden on labor shall not include any costs noted as general overhead. <br /> .5 Material, equipment and supply costs shall be quoted at the actual cost to , <br /> the Contractor, or Subcontractor. Upon request, the Contractor (or <br /> Subcontractor) shall submit evidence to substantiate the costs. Said costs ' <br /> shall be quoted at trade discount prices, with quantity discounts also <br /> applied where the quantities warrant. Cash or prompt payment discounts <br /> need not be credited. In any proposal with material, equipment and supply ' <br /> credits,,the credit.shall be based on the actual Contract cost of the material <br /> (including trade and quantity discounts) less any charges actually incurred <br /> for handling or returning a material which has been delivered. No ' <br /> cancellation, restocking or similar charge will be allowed unless actually <br /> incurred by the purchaser and generally will not be allowed when the <br /> product has not been shipped. ' <br /> .6 The percentages allowed for overhead, profit or commission under clause <br /> 7.1.5.2 shall be deemed to include, and no further addition allowed for: , <br /> (1) field and office supervision and administration, including the field <br /> superintendent and foremen; (2) general insurance, except that listed as the <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800- 12 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.