My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> CONDITIONS OF THE CONTRACT <br /> 00800-SUPPLEMENTARY <br /> ' CONDITIONS <br /> labor burden; (3) use or replacement of tools; (4) shop burden; (5) <br /> ' equipment rental (other than specifically required additional hoisting <br /> equipment, required excavating equipment or similar equipment necessary <br /> solely as a result of the change); (6) engineering and estimating costs; (7) <br /> performance (guaranty) bond; (8) cost of safety measures (including those <br /> imposed by OSHA); (9) shipping, drayage and demurrage; (10) parking <br /> charges; (11) clean up and debris removal; (12) testing; (13) permits, <br /> ' unless a new permit type is required; (14) or any other costs except those <br /> enumerated under clause 7.1.5. <br /> ' .7 Cost changes shall be computed by determining the basic costs <br /> enumerated under clause 7.1.5 (as further specified under this <br /> subparagraph), to which the overhead may be added, then the profit figure <br /> ' may be added and finally adding the sales tax on materials. <br /> .8 Subcontractors (or Sub-subcontractors) shall compute their costs in the <br /> ' same way and are subject to the same conditions of what may be included <br /> in the cost and the same maximum percentages for overhead and profit. <br /> To the subcontractor's price, the Contractor may add up to 5% <br /> commission. <br /> .9 For changes involving work of the Contractor with its own forces and <br /> work by a Subcontractor (or Sub-subcontractor), the commission shall be <br /> applied directly to the Subcontractor's price, with the overhead and profit <br /> figure applied only to the Work the Contractor performs with its own <br /> ' forces. <br /> .10 For changes involving both extra and credit amounts the overhead and <br /> ' profit, or commission, shall be applied only to net difference where the <br /> extra exceeds the credit. <br /> .11 For changes resulting in a credit in the basic costs, a reasonable allowance <br /> for..overhead,, profit.or commission,may,be.,required,to be. credited,the <br /> Owner, as approved by the Architect after consultation with the <br /> ' Construction Manager. In general, no credit for overhead, profit or <br /> commission will be required where the net change credit is minor or where <br /> the change in Work indicates it is reasonable that no credit be allowed to <br /> ' the Owner due to the effort, cost or responsibility of the Contractor. In the <br /> event of substantial subcontract credits, or for Work not performed by the <br /> Contractor, a reasonable overhead, profit or commission credit shall be <br /> ' allowed to the Owner. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800- 13 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.