Laserfiche WebLink
DIVISION 0 <br /> CONDITIONS OF THE CONTRACT <br /> 00800-SUPPLEMENTARY <br /> ' CONDITIONS <br /> labor burden; (3) use or replacement of tools; (4) shop burden; (5) <br /> ' equipment rental (other than specifically required additional hoisting <br /> equipment, required excavating equipment or similar equipment necessary <br /> solely as a result of the change); (6) engineering and estimating costs; (7) <br /> performance (guaranty) bond; (8) cost of safety measures (including those <br /> imposed by OSHA); (9) shipping, drayage and demurrage; (10) parking <br /> charges; (11) clean up and debris removal; (12) testing; (13) permits, <br /> ' unless a new permit type is required; (14) or any other costs except those <br /> enumerated under clause 7.1.5. <br /> ' .7 Cost changes shall be computed by determining the basic costs <br /> enumerated under clause 7.1.5 (as further specified under this <br /> subparagraph), to which the overhead may be added, then the profit figure <br /> ' may be added and finally adding the sales tax on materials. <br /> .8 Subcontractors (or Sub-subcontractors) shall compute their costs in the <br /> ' same way and are subject to the same conditions of what may be included <br /> in the cost and the same maximum percentages for overhead and profit. <br /> To the subcontractor's price, the Contractor may add up to 5% <br /> commission. <br /> .9 For changes involving work of the Contractor with its own forces and <br /> work by a Subcontractor (or Sub-subcontractor), the commission shall be <br /> applied directly to the Subcontractor's price, with the overhead and profit <br /> figure applied only to the Work the Contractor performs with its own <br /> ' forces. <br /> .10 For changes involving both extra and credit amounts the overhead and <br /> ' profit, or commission, shall be applied only to net difference where the <br /> extra exceeds the credit. <br /> .11 For changes resulting in a credit in the basic costs, a reasonable allowance <br /> for..overhead,, profit.or commission,may,be.,required,to be. credited,the <br /> Owner, as approved by the Architect after consultation with the <br /> ' Construction Manager. In general, no credit for overhead, profit or <br /> commission will be required where the net change credit is minor or where <br /> the change in Work indicates it is reasonable that no credit be allowed to <br /> ' the Owner due to the effort, cost or responsibility of the Contractor. In the <br /> event of substantial subcontract credits, or for Work not performed by the <br /> Contractor, a reasonable overhead, profit or commission credit shall be <br /> ' allowed to the Owner. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800- 13 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />